Welcome to awslagi.com – Sharing AWS, Anthropic, Google Cloud, Microsoft Azure IT Exams. It's free for all!

PMI Risk Management Professional

Specialized risk management expertise for high-stakes business success.

4.8★★★★★(264 ratings)
14,028 studentsAdvanced
Master the art of identifying, analyzing, and mitigating risks across the project lifecycle. This course validates your ability to protect organizational assets and ensure project success in uncertain environments. Gain expert skills in quantitative risk analysis, response planning, and risk governance. Become a vital asset in any enterprise by mastering advanced risk management strategies for complex projects.

What you'll learn

  • Risk Strategy & Planning
  • - Stakeholder Engagement
  • - Risk Process Framework
  • - Performance & Monitoring
  • - Quantitative & Qualitative Analysis

PMI-RMP

Lectures2
Questions89
Duration30 week
Students14,028

$20.00

Full Free Question Bank (89 Questions)

PMI Risk Management Professional (PMI-RMP) Practice Questions & Verified Answers

Click any option to test your knowledge, or reveal the verified answer and detailed explanation below each question.

Jump to Section:
Question #1Part 1

What are common examples used to communicate risk probability and impact?

ARisk checklist, risk assessment, regression analysis, and assumption and constraint analysis
BMonitor Risks process, multi-dimensional risk assessment, control chart, and Monte Carlo simulation
CProbability distributions, sensitivity analysis, modeling and simulation, and probability and impact matrix
DMonitor Risks process, assumption and constraint analysis, modeling and simulation, and risk register
Question #2Part 1

When using the risk register to manage the cost risk analysis, which of the following models the way correlation arises, and avoids the need to estimate the correlation coefficients?

ARisk Monte Carlo analysis
BRisk driver method
CRisk scatter diagram
DRisk RACI matrix
Question #3Part 1

Which of the following characteristics would a risk tolerant person or group demonstrate?

AAdaptable and resourceful; not afraid to take action; thrill seeking
BDiscomfort with uncertainty; low tolerance for ambiguity; seeks security and resolution in the face of risk
CRisk taking is a price worth paying for future payoffs; seeks strategies and tactics that have high future payoffs; thinks abstractly and creatively envisioning possibilities, and not afraid of change or unknowns
DReasonable comfort with most uncertainty; accepts risk as a normal feature of projects and business, and takes uncertainty in stride with no apparent or significant influence on their behavior
Question #4Part 1

The risk manager organizes a stakeholder meeting to obtain agreement on project risk response strategies. At the conclusion of this meeting, the risk response strategies should be which of the following?

AScheduled, budgeted, and easy for project stakeholders to understand
BCost-effective, validated by Monte Carlo analysis, and assigned
CIterative, scaled to the project, and addressing threats and opportunities
DTimely, cost-effective, agreed-upon, and accepted
Question #5Part 1

A new resource is added to the project team from a matrix organization. How should the project's risk manager familiarize the new team member with the project's risk management process?

AThe functional manager is responsible for providing the training.
BProvide project specific risk training and mentor through the risk process.
CSend the new team member the risk management plan to read.
DProvide the new team member with a copy of the risk register and latest status report.
Question #6Part 1

The stakeholder is unwilling to make decisions that would result in negative consequences to the project. Which of the following describes the stakeholder's attitude regarding project risks?

ARisk averse
BRisk neutral
CRisk accepting
DNot enough information available to describe the stakeholder's risk attitude
Question #7Part 1

A project manager is developing the risk management process and schedules a risk planning workshop at the start of the project. Upon receiving the invitation, a senior stakeholder emails the project manager stating that a risk management plan is not needed since this is a small project, and lack of a plan will reduce costs. Which of the following should the project manager do?

AAdvise the stakeholder that risk management is a valuable undertaking and must be applied to all projects to some degree.
BCancel the workshop, as the stakeholder is senior and risk management is an optional process, especially on smaller projects.
CContinue with the workshop, but remove the stakeholder from the list of attendees.
DReview the scope in an attempt to save money in other areas of the project to provide funding for the risk management activities.
Question #8Part 1

What is a project issue within a project environment?

AA negative effect on a project objective arising from occurrence of a threat
BA certain event which has a positive or negative impact in the project
CA risk which has a significant impact on the project
DAn uncertain event which may impact the project
Question #9Part 1

What is the purpose of mitigating negative risks as a part of the risk response process?

ATo transfer the probability of a risk happening to a third party, and to reduce the severity of the impact
BTo reduce the probability of a risk happening, and/or reduce the severity of the impact
CTo accept the probability of a risk happening to reduce the severity of the impact
DTo increase the probability of a risk happening, but reduce the severity of the impact
Question #10Part 1

In the country where a project is being executed, customs procedures are complex and change frequently. During the risk identification process, the project team identifies a risk related to delays in customs on substantial equipment that will likely occur. Equipment delays on this project could lead to the project cancellation. How should the probability and impact be characterized for this risk?

ALow probability/low impact
BHigh probability/low impact
CLow probability/high impact
DHigh probability high impact
Question #11Part 1

A risk is identified and documented by the risk manager, but it is unclear how this risk can be proactively managed. In this situation, what type of reserve should be allocated for the risk?

AContingency
BManagement
CBudget
DResidual
Question #12Part 1

Which of the following is an effective channel for risk mitigation assistance, project risk visibility and risk escalation support?

AProject steering committee
BProject management office (PMO)
CChange control board (CCB)
DBoard of directors
Question #13Part 1

The risk manager wants to determine what is to be measured, how it is to be measured, and what project outcomes are to be measured. In which of the following processes should this be established?

AInitiating Process
BExecuting Process
CPlanning Process
DMonitoring and Controlling Process
Question #14Part 1

The risk manager is conducting stakeholder analysis. Which technique should be used to help identify and manage expectations?

ASWOT analysis
BInfluence diagram
CPower/Interest Grid
DInteractive method
Question #15Part 1

What steps would be used during the qualitative risk analysis process to provide input to the risk register?

ASelect risks characteristics, collect and analyze data, prioritize risks, categorize risks causes, document results
BInterviews, expert opinions, sponsor inputs, risk manager review, prioritize risks, and document results
CInterviews, expert opinions, risk manager review, prioritize risks, and document results
DSelect risks characteristics, collect and analyze data, prioritize risks, discuss action plans for major risks, document results
Question #16Part 1

A project manager is hired as a consultant by the executive sponsor to manage a major change program that has experienced two past failures. The current executive sponsor believes the project is in good shape based on feedback from the last project manager and reports this to senior executive management. The executive sponsor believes there were no major risks threatening the time, budget, or quality of the project. In the first week of risk analysis, the project manager concludes the project timeline is unrealistic and is three months behind schedule. The organization's risk appetite is low. What is the first step that should be taken?

AReview the project schedule and recommend fast tracking the schedule and/or crashing the critical path.
BDiscuss the project schedule with the executive sponsor and agree on a strategy for updating the risk management plan and risk response plans.
CUpdate existing risk response plans and include more resources to get the project back on track.
DImmediately call a steering committee meeting, report the project status, and suggest project scope reductions to save time.
Question #17Part 1

During what process should a project manager assign a risk owner?

APlan Risk Responses
BPlan Risk Management
CMonitor Risks
DIdentify Risks
Question #18Part 1

A risk manager wants to determine which risks are going to have the highest impact on a project. Which of the following techniques should the risk manager use?

AAssumptions analysis
BSensitivity analysis
CRoot cause analysis
DPrioritization matrices
Question #19Part 1

Critical deliverables are delayed, because a key subject matter expert (SME) does not have enough time to allocate to the tasks. How could the situation be improved for the future?

ACross train others to reduce the SME workload.
BIntroduce scope reductions to limit the reliance on SMEs.
CReplace the SME with resources, who are responsible for receiving output from the SME on their deliverables.
DExtend the project schedule timeline to accommodate availability of the SME.
Question #20Part 1

The project manager generates a monthly risk report for key stakeholders which documents high and medium risk items only. Where would the project manager find the list of recipients for the report?

ACommunications management plan
BRisk management plan
CRisk register
DProject charter
Question #21Part 1

A CEO wants to reduce costs in the time spent for risk management activities. What step did the risk manager fail to perform?

AAssigning the CEO as a risk owner
BPreventing all issues from occurring
CProperly communicating the risk management activities and their outcomes
DExplaining the purpose of the management reserve
Question #22Part 1

A risk on the risk register is triggered. This triggered risk costs US$200,000 to mitigate and will overwhelm the project, causing it to fail if not mitigated. The project manager identifies that there is US$200,000 left in the management reserve. From which of the following sources should the funds be drawn to cover the risk mitigation?

AOrganization management reserve
BUnplanned risk reserve
CContingency reserve
DManagement reserve
Question #23Part 1

Which tool can the project risk manager utilize to help identify and assess project risks?

ARisk audit
BRisk surveys
CRisk manager interviews
DRisk sensitivity surveys
Question #24Part 1

The project manager is unable to obtain a global consensus of competing subject matter experts and stakeholders on the project scope. This has caused a one- month delay. What should the project manager do next to reduce further delay?

AInitiate a scope change request.
BSchedule a project kick-off meeting.
CSchedule a stakeholder meeting.
DEngage the project sponsor/portfolio manager.
Question #25Part 1

A risk is identified early in the project. After six months, it is determined that the risk does not apply to this particular project. How should the risk be handled by the risk manager?

AIgnore the risk and concentrate only on the pertinent risks.
BRemove the risk from the risk register and inform the project manager that it is no longer valid.
CClose the risk during the next risk board meeting and keep it in the risk register.
DConduct a risk analysis to determine how an inappropriate risk was formally accepted.
Question #26Part 1

During a weekly project review meeting, a stakeholder identifies some new risks. When creating risk responses for these newly identified risks, what should the project team do to discover trends and more efficiently manage the responses?

AClassify the risk impacts based on their severity.
BList workaround solutions.
CIdentify the risk owners.
DDetermine the root causes.
Question #27Part 1

A project team is conducting initial risk planning. What other risk-related task should the project manager perform?

AIdentifying the risk threshold
BDetermining the risk register headings
CScoring the risks utilizing the risk matrix
DPrioritizing the risks in the risk register
Question #28Part 1

A company is executing a high-visibility project to develop mobile phone technology. The project sponsor is concerned that an overall high risk rating may undermine support for the project within the company. The sponsor has instructed the project manager to manipulate the data used for Monte Carlo simulation to artificially reduce the risk rating. What should the project manager do?

ASchedule a face-to-face meeting with the project sponsor.
BModify the data.
CIgnore the request.
DEmail the project sponsor explaining why the data should not be modified.
Question #29Part 1

The project manager schedules a third workshop to facilitate the qualitative risk analysis. One team member complains that they should not have iterative meetings, but rather, should complete this at the beginning of the project. Which of the following should the project manager do?

AContinue with the workshop, but discipline the team member for undermining the authority of the project manager.
BAgree with the team member, as qualitative analysis should only be performed during the initial stages of a project.
CProceed with the meeting, but remove the team member from the invitees' list.
DExplain that it is good practice to perform qualitative analysis throughout the life of the project.
Question #30Part 1

Which of the following situational factors has a significant effect on risk attitude?

AThe risk heuristics evaluation available to the project team during planning and execution
BThe perception of probability or frequency of occurrence and the perception of impact magnitude
CThe number of project team members with close relationships to the chief executive officer (CEO)
DThe number of external stakeholders and the potential for indirect consequences
Question #31Part 1

Upon returning from vacation, the risk manager observes during the project status meeting that several activities being accomplished were not in the original plan. What should the risk manager do first?

AMeet with the project team.
BInform management of out-of-scope work.
CReview activities for new risks.
DReview the change control log.
Question #32Part 1

As part of identifying the risk appetite of project stakeholders, the project manager must first identify the stakeholders. Which of the following inputs are used to identify project stakeholders?

AProject charter, management reserve, enterprise environmental factors, and organizational process assets
BProject management plan, human resource plan, enterprise environmental factors, and organizational process assets
CProject charter, bid documents, enterprise environmental factors, and organizational process assets
DProject charter, communications management plan, enterprise environmental factors, and organizational process assets
Question #33Part 1

After applying several risk identification techniques, the risk manager is ready to document project risks in the risk register, including risk name, risk statement, probability of occurring, and potential impact. After this information is complete, who is best suited to serve as risk owners?

ARisk manager
BProject sponsors
CProject manager
DProject team members
Question #34Part 1

Which of the following should the risk manager consider as external environmental factors when creating the risk management plan?

AGovernment regulations, industry best practice templates, organizational standard processes, and competitor landscape
BGovernment regulations, industry standards, conditions of the marketplace, and competitor landscape
CGovernment regulations, risk categories, organizational standard processes, and competitor landscape
DGovernment regulations, human resource policies and procedures, organizational standard processes, and competitor landscape
Question #35Part 1

Within the organizational process assets, where would the project manager find risk response effectiveness from past projects?

AChange management plan and lessons learned
BStakeholder register and lessons learned
CRisk audit and lessons learned
DRisk audit and risk matrix
Question #36Part 1

In the country where a project is being executed, customs procedures are complex and change frequently. During the risk identification process, the project team identifies a risk related to delays in customs on substantial equipment that will likely occur. Equipment delays on this project could lead to project cancellation. Why should a mitigation plan be developed for this risk?

AThis is a financial risk.
BThis task is on the critical path.
CA response plan should be developed for all risks.
DThis is a high-priority risk.
Question #37Part 1

A race director is planning a marathon with US$80,000 in upfront costs that will be offset by race fees. The remainder of the funds will be donated to a national charity. State law mandates that all money paid by the participants must be refunded if the race is cancelled for any reason. Which of the following is the best example of a risk mitigation response?

ALet the runners know the race will be cancelled only in the event of an emergency.
BPurchase an insurance policy covering up to US$85,000 in losses, at a cost of US$5,000, in the event the race is cancelled.
CInform the charity that they will receive no funds should the race be cancelled.
DCharge the runners an additional amount to cover the US$80,000.
Question #38Part 1

The risk manager for a construction project graphically groups project risks by the subsets of economic risk, social risk, and technical risk. Where has this information been captured?

ARisk breakdown structure
BRisk management plan
CRisk register
DRisk control plan
Question #39Part 1

When considering human factors and risk attitudes relative to the risk process, which approach should be used to influence the risk management process for optimal effects at the individual and group levels?

AAgile
BReactive
COngoing
DProactive
Question #40Part 1

What identification technique is used to help reduce the ambiguity of a risk statement?

ADriver, risk, outcome
BExploit, risk, accept
CProbability, risk, impact
DCause, risk, effect
Question #41Part 1

A project team's risk facilitator identifies a number of risks and must prioritize them based on the organization's risk appetite levels. Which technique should be used?

APERT
BStakeholder risk profile analysis
CProject scope statement analysis
DMonte Carlo technique
Question #42Part 1

While preparing for a project review meeting with leadership, the project team analyzes and checks its scope activities and discovers missing requirements. The project risk manager decides to hire a subcontractor to fulfill these newly discovered requirements. What risk strategy did the project risk manager use?

AAvoid
BTransfer
CAccept
DMitigate
Question #43Part 1

During project execution, the project team realizes that the power outlet for imported equipment is not compatible with the current customer's electrical infrastructure. This event was originally identified as a risk during earlier stages of the project and the associated risk response indicated a plan to purchase a new power adapter. Which project fund will be used to cover this cost?

AManagement reserve
BManagement budget
CProject budget
DContingency reserve
Question #44Part 1

A heavy industrial design firm has over USS3 billion in current contract value. As a result of quantitative risk analysis of a geographically separated project, opportunities have been identified and assessed as high priorities for the project. What is the most effective method to capture these opportunities?

AIntegrate them into the RBS.
BSchedule a project team meeting.
CFormally notify the project manager.
DEstablish a contingency reserve.
Question #45Part 1

How can the project manager rank competing stakeholder priorities for all the identified risks?

APerform qualitative and quantitative risk analysis.
BEngage the project sponsor to decide.
CRefer to stakeholder analysis prioritization tree.
DPerform a review of organizational process assets.
Question #46Part 1

The senior risk manager hears that critical deliverables are delayed, because a key subject matter expert (SME) does not have enough time to allocate to the tasks. Which area should be reviewed, as an opportunity for the risk manager to coach the project manager responsible for the project?

AScope reduction to reduce SME reliance
BRisk management plan and planned risks responses
CRisk identification process and participation
DDetailed review of the project schedule before approval
Question #47Part 1

A project manager has a two-month project with three project team members. The project sponsor does not agree with the project manager that a risk planning process is necessary, since the project is very small. Would it be appropriate for the project manager to implement some level of risk management?

AYes, even small projects may require risk planning.
BNo, small projects do not usually require risk planning.
CNo, risk planning should be initiated with the sponsor's consent.
DYes, the risk planning process implementation is ultimately the project manager's decision.
Question #48Part 1

Which of the following would a proactive risk manager do during the Monitoring and Controlling Process?

ADevelop risk responses, create risk management plan, and stay alert for risk events.
BUpdate the lessons learned documents, develop risk responses, and create the risk management plan.
CReview identified risks, stay alert for risk events, and remind team members to keep the risk manager informed about risk triggers.
DReview lessons learned document to identify risks, quantify risks, and lower impact ratings.
Question #49Part 1

A stakeholder is asked to approve additional funding to implement a risk response plan. However, the stakeholder is unsure of the amount that could be approved without escalation. Where should the stakeholder look to determine the amount that can be approved?

AProject charter
BRisk management plan
CRisk register
DOrganizational process assets
Question #50Part 1

Project stakeholders identify, analyze, and plan the risk responses for a project. However, the contingency reserves are depleted before the project is completed. What recommendation could be implemented to prevent this from recurring?

AUse the Monte Carlo simulation.
BImplement a reserve analysis process.
CConduct more frequent reserve watch list status meetings.
DIncrease the contingency reserve.
Question #51Part 1

After a risk review meeting, three key risks are identified as likely to be realized. The project manager requests a risk scenario be calculated to establish the impact on the budget. What is the forecasting methodology that should be utilized to calculate the impact?

AEstimate to complete (ETC)
BBudget at completion (BAC)
CEstimate risk completion (ERC)
DEstimate at completion (EAC)
Question #52Part 1

Which of the following could be included in risk monitoring and controlling techniques?

AStatus review meetings, trend analysis, earned value analysis, McGregor's analysis, defect repair, inspection
BStatus review meetings, variance analysis, trend analysis, earned value analysis, inspection, control charts
CStatus review meetings, control charts, Inspection, defect repair, Maslow's analysis, trend analysis
DVariance analysis, trend analysis, earned value analysis, Maslow's analysis, control charts, brainstorming
Question #53Part 1

The company is a risk seeking organization, and has experienced measurable success based on their current strategy for growth. A new project has that exceeds the risk levels documented in the risk management plan. What would be the best course of action for the company to take with the project based on its current scope?

AMonitor ongoing risks closely for any major changes.
BPerform a Monte Carlo simulation to understand possible risk outcomes.
CCancel the project, as the overall level of risk remains unacceptable.
DConduct a stakeholder meeting to validate stakeholder risk appetite.
Question #54Part 1

While creating the appropriate risk strategy, the project manager discovers that the project team lacks the necessary expertise to define the risk management plan. What additional resources should be utilized?

AConsultants, organizational process assets, subject matter experts, and stakeholder tolerance analysis
BConsultants, industry group, and subject matter experts
CConsultants, professional and technical associations, subject matter experts, and industry groups
DConsultants, professional and technical associations, and subject matter experts
Question #55Part 1

A project manager is creating a risk management plan, but participants in a group meeting are hesitant to express their concerns. What will encourage participants to offer their opinions?

ABrainstorming
BMonte Carlo simulation
CInterviews
DNominal group technique
Question #56Part 1

Which of the following is a key element of neuro-linguistic programming?

ARe-coding based on agile methodology
BFlex-scheduling
CCross-training
DBuilding rapport with others
Question #57Part 1

When monitoring the execution quality of risk-related plans and processes, which of the following would be a useful metric to track and record?

AThe number of risks in the project risk register
BThe degree of variation from the baseline
CThe number of levels in the risk breakdown structure
DThe degree of variation from the risk response strategy
Question #58Part 1

A project manager identifies a risk in a multifunctional project and decides to take no action. What should the risk manager do if the risk occurs?

AImplement a workaround.
BCreate a change request.
CImplement a contingency or fallback plan.
DReview the project management plan.
Question #59Part 1

The project manager must evaluate two separate contractors for a project with an absolute finish date of 15 December. After performing a Monte Carlo assessment on the submitted schedules, the following information is found: Which contractor should be chosen, because of having the highest statistical output?

AContractor A should be chosen based on confidence level.
BContractor B should be chosen based on probability.
CContractor A should be chosen based on probability and confidence level.
DContractor B should be chosen based on probability and confidence level.
Question #60Part 1

When analyzing the reward system in a company, there is evidence that "fire-fighter behavior" is the highest rewarded behavior. It suggests that people are dealing with major problems primarily in an emergency mode, and deploying quickly. Secondly, those who work efficiently are getting the most attention and recognition for their efforts. What impact does this observation potentially have on the risk management process?

ANothing, since the reward system does not have any impact on the risk management process.
BIt means that this company's culture does not reward all people, and it gives little attention to proactive behavior such as risk management.
CIt does not matter as each project has its own rewards system with no relationship to the company's rewards.
DThis is a positive situation for risk management, since it encourages quick deployment of solutions and workarounds when necessary.
Question #61Part 2

Which of the following techniques for planning risk response can provide a means of identifying symptoms for use as trigger conditions for contingency responses?

ARoot cause analysis
BQuantitative risk analysis
CEnsuring that actions are available to address significant events before their occurrence
DInvolving selected experts in the process
Question #62Part 2

What best describes the job of a risk owner?

AResponsible and accountable for managing risks
BCreating a detailed description of a risk
CResponsible and accountable for the risk management plan
DActively involved in the identification of new risks
Question #63Part 2

A six-month, USS1.2 million project is two months completed. The project has 3 high, 6 medium, and 2 low risks, with a 10% reserve for known risks, and a 5% reserve for unknown risks. Most of the project's reserves have not been spent. The risk manager, who is also the project schedule manager, establishes monthly risk management reviews to evaluate performance. So far, the project has missed 50% of the planned risk mitigation milestones. Based on this project data, what technique should the risk manager recommend to improve the risk management process?

AIncrease the risk manager's position to a full-time position and acquire a dedicated project schedule lead.
BAdjust project risk thresholds to increase the number of residual risks on the project.
CIncrease the frequency of risk status meetings and update the risk management plan.
DPerform a variance analysis and potentially allocate more reserves to improve risk mitigation.
Question #64Part 2

Which of the following best describes the strength of the probability and impact matrix for qualitative risk analysis?

AIt is well-suited to a decision tree analysis.
BIt assists in handling other factors such as urgency and manageability that may partly determine the risk's ranking.
CIt provides expert facilitators for the quantitative risk analysis.
DIt reflects the organization's level of risk appetite.
Question #65Part 2

The risk manager and the project team conduct a risk brainstorming session for a new project. The risk manager wants to involve the entire project team in a group risk prioritization exercise for the identified risks. The project manager refuses the involvement of the entire project team due to resource concerns. What should the risk manager do?

AConvince the project manager of the importance of the whole project team's involvement in the full risk process.
BContinue to involve the project team in the risk prioritization process and then discuss lessons learned with the project manager.
CFollow the project manager's instruction, as the project manager is the responsible party.
DInform the sponsor about the project manager's decision and the disagreement between parties.
Question #66Part 2

A mobile operator wants to test a new network prototype before conducting full implementation on the entire network. What type of risk response strategy did the mobile operator choose?

ATransfer
BMitigate
CAvoid
DAccept
Question #67Part 2

The risk manager for a data center infrastructure project performs a risk audit. Which of the following represents the primary goals of the audit?

AAssess performance of project team members and make required changes.
BDocument new risks identified and take the appropriate actions.
CAssess responsibilities of risks that have occurred and take the appropriate actions.
DDocument what went well and not so well with the risk management process, and recommend actions to improve.
Question #68Part 2

At the completion of a small project, the risk manager performs a risk audit and finds that several identified risks had occurred, and the impact was significantly larger than expected. While the project remained on schedule, the project budget increased by 50%. The project met all risk response milestones and no additional, previously unidentified risks, occurred on the project. Based on this information, what risk management process improvement should the risk manager recommend for future similar projects?

AIncrease frequency of risk management meetings with the project manager.
BRevise the level of accuracy of probability and impact scores.
CDocument the risk audit report and capture it in the lessons learned database.
DExpand the use of risk identification techniques.
Question #69Part 2

The project manager has asked for the P50 estimate for the project schedule. What is the P50 estimate?

A75 days
B73.5 days
C73 days
D72.5 days
Question #70Part 2

A project risk manager is concerned about the low performance of risk management on a mission-critical project. After assessing the situation, the risk manager finds that the communication style may be the main contributor. What could the project risk manager do to adjust the approach to influence team members to improve performance?

AUse follow-up emails, adopt an open door policy, and ask for feedback.
BSeek hidden agendas, vent frustrations, and allow others to vent frustrations.
CProvide continuous support, counseling, build trust, and open communications.
DConduct one-on-one meetings, more frequent follow-up meetings, and implement the management by walking around technique.
Question #71Part 2

A project's risk manager successfully implements the risk management plan and the risk register. Furthermore, the risk analysis and the risk response planning are finalized. All results have been documented, and the project management plan and other project documents have been updated accordingly. What should the risk manager do next?

APerform a lessons learned document update with the defined risks.
BPerform regular reserve analysis to ensure that the assigned risk reserve budgets are sufficient.
CPerform risk date quality assessments.
DPerform continuous risk re-evaluation throughout the project life cycle to ensure risk management effectiveness.
Question #72Part 2

Very low = 1, Low = 2, Moderate = 3, High = 4, Very High = 5 A project manager must complete a report for a stakeholder who is concerned about the possibility of a funding shortfall. What is the most effective way to explain the risk to this stakeholder?

AThe funding shortage is the lowest ranked/scored risk.
BThe funding shortage is a significant risk.
CThe funding shortage will have a very high impact on the project and is the highest priority.
DThe funding shortage has a very low probability of occurring and is not a concern for the project.
Question #73Part 2

Which of the following success factors will enhance the Perform Qualitative Risk Analysis process as the risk occurrence gets closer?

AAgreed-upon definition
BIterative analysis
CHigh quality information
DAgreed-upon approach
Question #74Part 2

A project team member identifies, but does not document, a risk early in the project, because it is considered to be trivial. This risk occurs later and negatively impacts the project. What could the project manager do to avoid this situation?

AConduct team meetings early in the project to ensure team member are familiar with risk identification requirements.
BCommunicate the punishment and rewards policy to the project team during the project kick-off meeting.
CProvide project team members with access to simulation tools and decision tree diagrams.
DProvide team members with a risk management prompt list early in the project to ensure risks are not missed.
Question #75Part 2

A project in the execution phase at the customer's site has an issue concerning new parts that do not fit properly into a machine. The site project manager cannot find this high probability risk in the risk register. What action should the site project manager take?

AVariance analysis
BWorkaround
CRisk assessment
DRisk audit
Question #76Part 2

Which of the following represents the best description of the role of project manager for project risk management?

ADetermining the acceptable levels of risk for the project in consultation with stakeholders, approving the risk management, assessing the impact of proposed scope changes
BDetermining the acceptable levels of risk for the project in consultation with stakeholders, approving the project management plan, participating in all aspects of the project risk management process
CApproving the risk management plan, participating in all aspects of the project risk management process, auditing the risk management processes in the project
DDetermining the acceptable levels of risk for the project in consultation with stakeholders, approving the risk management plan, participating in all aspects of the project risk management process
Question #77Part 2

For the last several months, a project manager for a global technology program is focused on improving the project outsourcing process and analyzing the vendor supply chain as key pieces of the cost containment strategy. Early in the project, these two areas were identified as key risks to the final delivery of the project. Since that initial risk identification, the risk manager works to identify additional risks, as well as analyze the potential impact to the project cost baseline. After performing a cost-risk sensitivity analysis, the risk manager produces this chart. Based on this analysis, which two risk areas should the project manager focus on to control project cost?

AVendor supply chain disruption and final system test
BVendor supply chain disruption and software design changes
COutsourcing negotiations and vendor supply chain disruption
DLabor rate increases and management reviews
Question #78Part 2

A risk manager is assigned to a short-term telecommunications upgrade project. This project is not technically complex, but has rigorous implementation timelines, and very little cost reserve available to address potential problems. The project manager indicates that completing the project on time is critical, but should not be done at the expense of performance. Which aspect of risk impact is most important when designing the risk impact scale?

ATechnical performance
BCost
CTechnical requirements
DSchedule
Question #79Part 2

A risk manager works with the project team, senior management team, subject matter experts and other stakeholders to identify the project risks. Which of the following tools/methods from the risk management plan can be used to identify a risk, which is based on project objectives by category?

AAffinity diagram
BRisk breakdown structure
CDecision tree method
DWork breakdown structure
Question #80Part 2

As a result of the Control Risk process, the project manager updates the project risk documents using outcomes from which of the following?

ARisk reserve analysis and risk thresholds
BRisk response strategies and risk analysis
CRisk reviews and risk register analysis
DRisk assessments and risk audits
Question #81Part 2

The risk manager is prioritizing risks based on the potential impact to cost and schedule and identifies the following 4 risks: Risk 1 has a US$500,000 potential cost increase, and a 60 day potential schedule slippage, with a 25% probability of occurring. Risk 2 has a US$200,000 potential cost increase, and a 20 day potential schedule slippage, with a 60% probability of occurring. Risk 3 has a US$1,200,000 potential cost increase, and a 90 day potential schedule slippage, with a 10% probability of occurring. Risk 4 has a US$600,000 potential cost increase, and a 70 day potential schedule slippage, with a 20% probability of occurring. Using expected monetary value calculation, which risk has the greatest potential impact to cost and schedule?

ARisk 1
BRisk 2
CRisk 3
DRisk 4
Question #82Part 2

The expected monetary value of a project is above USS1 million. The risk manager is concerned about this situation, and decides to review the related plans and processes to evaluate the degree of variation from the baseline. Next, the risk manager needs to document the results of such an analysis. What is the best document for the project manager to reference to find out where the results of such an analysis should be documented?

ACommunications management plan
BIssues log
CRisk management plan
DLessons learned
Question #83Part 2

The project manager requests a method to analyze risk data in a simple format. Which of the following formats should the risk manager suggest for preliminary review of the data?

AMonte Carlo analysis
BFishbone diagram
CLatin Hypercube analysis
DData tables
Question #84Part 2

A newly assigned project manager is reviewing the project documents with stakeholders to identify opportunities that will fast track the project and realize the financial benefits of early completion. What document should be updated at the end of the review?

ARisk register
BRisk response plan
CRisk management plan
DRisk identification plan
Question #85Part 2

The feasibility of the risk management planning is dependent upon which of the following aspects of the organization?

ACompetitive market share
BLevel of risk management maturity
CAlignment with industry standard requirements
DCulture, people and infrastructure capabilities
Question #86Part 2

The team has just completed a risk response planning session and identified responses for all the high and medium priority risks. What should the team do with the remaining low priority risks?

ACreate risk responses later, as time allows.
BAdd the risks to a watchlist for periodic monitoring.
CRemove the risks from the risk register.
DConduct a low priority risk response planning workshop with key stakeholders.
Question #87Part 2

PESTLE, TECOP, and SPECTRUM are three examples of prompt lists that can be used during risk management activities. Prompt lists are used to do which of the following?

ASimulate risk identification.
BPerform a simulation with all prompted risks varying simultaneously.
CIdentify basic causes of risks of more fundamental forces.
DAchieve the relative weighting of the risks.
Question #88Part 2

During a major project review, the project manager discovers that large groups of internal management issues are obstructing progress. In reviewing the risk management plan, the project risk categories largely contain technical and customer relationship type risks. The project manager wants the risk management plan revised to account for these risk areas, particularly because the project has several more months before completion. Who should the project manager collaborate with to revise the risk management plan at this stage of the project?

ARisk manager, technical manager, and customers
BProject sponsor, product owner, and risk owners
CRisk manager, product owner, and risk owners
DRisk manager, risk owners, and project sponsor
Question #89Part 2

A regional vendor for custom manufactured steel oil derricks is awarded a contract to design, manufacture, and install 40 offshore oil platforms. Installation of these derricks requires precision placement and stable seas for the transport and installation ships to properly install the deep water structure. It takes 65 days to transport the deep water structures for each platform from the manufacturing facility to the installation site at a cost of US$155,000 per day. The monsoon season runs from May to September each year and is a known risk for placement of the oil platforms. There is an incentive clause in the contract that will provide a US$1,500,000 payment, if all 40 platforms are in place and ready for use by 5 January 2016. What is the probability of receiving this incentive?

A35.0%
B42.9%
C44.5%
D47.5%

📢 Unlock Full Access to Success!

"The content displayed here is a promotional preview and contains only 50% of the actual exam database. To access the complete set of updated questions, please upgrade to the Full Version."

👉 Click the button and follow the instructions to secure your full access immediately!