PMI Professional in Business Analysis

Professional business analysis expertise for project success and value.

4.8★★★★★(382 ratings)
16,306 studentsAdvanced
Bridge the gap between business needs and project solutions as a certified Professional in Business Analysis. This course validates your ability to lead requirement management and ensure project outcomes deliver real value. Gain expertise in evaluation, elicitation, and analysis of business requirements. Prepare to lead your organization's digital transformation as a vital link between business and technology.

What you'll learn

  • Needs Assessment & Evaluation
  • - Planning & Analysis
  • - Traceability & Monitoring
  • - Solution Evaluation
  • - Requirements Elicitation

PMI-PBA

Lectures2
Questions78
Duration30 week
Students16,306

$20.00

Full Free Question Bank (78 Questions)

PMI Professional in Business Analysis (PMI-PBA) Practice Questions & Verified Answers

Click any option to test your knowledge, or reveal the verified answer and detailed explanation below each question.

Jump to Section:
Question #1Part 1

A business analyst is developing a traceability matrix to determine whether or not any gaps exist and to identify any discrepancies. Which critical field is needed to ensure that the traceability matrix is usable?

AHierarchy
BRequirements description
CStatus
DOwner
Question #2Part 1

The customer and the business analyst are collaborating in the development of a solution scope. It is important for the customer to:

Aspend the time required to provide, clarify, and elaborate requirements.
Bcommunicate changes to requirements only when they are completely defined.
Cperform an alternatives analysis for requirements implementation.
Dchallenge assessments of the cost and feasibility of requirements.
Question #3Part 1

A business analyst is leading a project to implement automated order entry software at a local pizza restaurant. The business analyst has very little information about the project: the ordering process takes too long and often ends in incorrect orders. What step should the business analyst take next?

AIdentify testing resources to support the implementation.
BRequest information on the current ordering process and compare it with other companies.
CSelect the software to implement and start working with the technical resources.
DSchedule a requirements gathering sessions with the manager of the ordering department.
Question #4Part 1

After a project was delivered, the business analyst learns of a project objective with no associated requirement. What would have helped determine this issue before delivery?

AContext diagram
BUse cases
CTracing requirements
DProcess flow
Question #5Part 1

A business analyst is conducting a cost-benefit analysis of potential solution options. The stakeholders have indicated that the estimated growth rate is very important to them. Which technique will allow the business analyst to determine this information?

ANet present value (NPV)
BPayback period
CReturn on investment (ROI)
DInternal rate of return
Question #6Part 1

During user acceptance testing, a defect is logged by a user from a department that did not participate in the requirements analysis. To avoid this situation and minimize impact on the project, the user should have been:

Ainterviewed to understand how the user’s work would be impacted.
Binvolved in the development and sign-off of the business requirements.
Cgiven the opportunity to review the user acceptance test scripts.
Didentified as a stakeholder as part of the stakeholder analysis.
Question #7Part 1

A business analyst is reviewing a discrepancy report after a test session. The discrepancy report has revealed a defect that the business analyst must address. Which of the following criteria should the business analyst use to identify the appropriate response to the defective test result?

APerform an impact analysis and open a change request to include the revised requirement in the next baseline.
BInspect the requirements traceability matrix to verify if the requirement is connected to a use case.
CDetermine if the defect is in the solution developed, in the original requirement or in the test case.
DVerify that the corresponding requirement was appropriately signed off by the requesting stakeholder.
Question #8Part 1

During validation of a project solution, the business analyst discovers that a requirement has been altered. Instead of placing the company logo in the upper-left corner of the window, it is displayed in the upper-right corner. When the business analyst asks the developer about the change, the developer says that one of the stakeholders asked directly for the change. Which correct action should the business analyst take?

AConfront the stakeholder that requested the change.
BFollow the change control process as defined in the business analysis plan.
CDiscuss the change in the next stakeholder meeting.
DAsk the developer to correct the logo as stated in the requirement.
Question #9Part 1

A company is developing a new e-commerce platform to enter a new market segment. Development is well under way when the government issues a new set of regulations. Which course of action should the business analyst take?

ACheck the traceability matrix to identify affected use cases.
BEvaluate if the new set of regulations is aligned with the business case.
CEvaluate the impact of the change on the project schedule.
DObtain management sign-off on the new set of regulations.
Question #10Part 1

Requirements elicitation for a project is occurring. The marketing, acquisition, and production departments want to include specific requirements. The CEO has a requirement to deploy in three months. Which of the following actions will have a greater influence on the project success?

AEstimate the effort required for each requirement and develop as many functionalities as possible.
BPrioritize and develop the requirements of the marketing department since the project will impact a greater number of people.
CConduct a stakeholder analysis and balance requirements by understanding the relative power associated with each stakeholder group.
DExplain the situation to the CEO and try to obtain an extension of the contract for the actual time necessary to develop the system.
Question #11Part 1

A stakeholder wants to modify an existing feature. Which of the following would be used to determine the scope of the change on the product?

ASequence diagram
BRequirements traceability matrix
CRequirements attributes table
DProject schedule and cost baseline
Question #12Part 1

A company’s management team has decided to deploy a new product. However, there is concern that users may not accept a new product that forces them to change existing practices. The business analyst should:

Aadhere to the project plan to achieve project objectives.
Bclearly communicate project objectives and attempt to defuse tensions.
Cdelay the application’s deployment until the conflicts have been resolved.
Dvoice user concerns to management and recommend that the project be closed.
Question #13Part 1

A business analyst is working with the project manager, company auditors, and project stakeholders to determine whether formal signoff should be required for the project. For which reason would the business analyst recommend formal signoff to the group?

AThe organization follows an iterative project life cycle.
BThe project impact is contained within a small department of the company.
CErrors in the product could result in financial solvency.
DThe industry is unregulated.
Question #14Part 1

Through user acceptance testing, a software flaw was identified. What should the business analyst do next as part of the root cause analysis in order to analyze and resolve the discrepancy?

ACreate an interface analysis
BCreate a Delphi estimation.
CCreate a functional decomposition.
DCreate a fishbone diagram.
Question #15Part 1

A national company with offices in every state in the country has deployed a solution to allow employees to view their health benefits online. The business analyst on the project team is validating solution results to assess whether or not the solution has achieved the desired business result. Which is the best technique to gather information from employees regarding their satisfaction with the solution?

ASurvey
BOrganization modeling
CFocus groups
DInterface analysis
Question #16Part 1

A sponsor requests a new requirement. The business analyst explains that most of the information needed for this requirement does not exist and that the requirement cannot be implemented. The business analyst recommends deferring the requirement until the needed information is available and then adding it to a subsequent project. The sponsor agrees. What should the business analyst do next?

AMark the requirement as complete so that it is not forgotten.
BAsk the stakeholder to review the requirement before any other action is taken.
CCommunicate that the status of this requirement has changed.
DBring the subsequent project to the change control board (CCB).
Question #17Part 1

What should a business analyst do after discovering that two solution requirements conflict?

ACommunicate the conflict to stakeholders and facilitate a resolution.
BUpdate the requirements baseline and upload it to the project repository.
CPerform an impact analysis and propose a lower-cost alternative,
DConsult the sponsor(s) and log the constraint.
Question #18Part 1

A business analyst is working on a project to implement a new call management system for a help desk. They expected the average time interval to answer a call to decrease over time, but the interval has increased instead. Which technique should the business analyst use to investigate the problem?

AObservation
BProcess modeling
CRoot cause analysis
DInterviews
Question #19Part 1

In the middle of a project, a new requirement was added to the scope. The business analyst must determine if any impacts, dependencies, or risks are associated with the addition to the scope. What task should the business analyst perform in order to identify these impacts?

AManage requirements traceability.
BManage assumptions and constraints.
CManage solution scope.
DManage requirements prioritization.
Question #20Part 1

The business analyst wants to ensure that requirement changes can be formally tracked after the product is baselined. What will the business analyst need to evaluate the proposed change?

AScope statement
BImpact analysis
CRequirements management plan
DPareto analysis
Question #21Part 1

When a change request is received, the business analyst is responsible for:

Aanalyzing the impact on business and underlying systems.
Bprioritizing and scheduling the changes requested.
Censuring that change-related incidents are minimized in production.
Danalyzing the impact to the project schedule and budget.
Question #22Part 1

While preparing a business case, an experienced business analyst faces difficulty in deciding which of three different solution options to recommend. The senior vice president (SVP) who requested the business case favors an outsourced solution; however, an analysis favors a custom-developed solution, either but internally or using contract labor. To prepare the recommendation, what should the business analyst do?

APerform solution evaluation.
BRecommend the SVP’s choice, as it is most likely to be adopted.
CReview the stakeholder analysis
DFormulate a weighted-ranking matrix.
Question #23Part 1

The software developers have delivered a completed solution. The quality assurance team has passed the solution. What should the business analyst do next?

AEvaluate the solution against the project charter.
BConduct performance testing.
CEvaluate the solution with the sponsor(s)
DConduct user acceptance testing.
Question #24Part 1

Which solution should be chosen according to the completed weighted-ranking matrix?

AEnhance the existing system.
BPurchase off-the-shelf software.
CDevelop in-house software.
DOutsource the development.
Question #25Part 1

A business analyst is assigned to the lead analyst role for a project. This project is one of the largest in the history of the company and includes several components and complex interfaces. The system in development will be used by a wide variety of stakeholders. Which tool should the business analyst use to trace the large number of requirements that will be generated by this project?

ASequence diagram
BConfiguration management system
CProcess mode
DData dictionary
Question #26Part 1

A firm implements SharePoint and the business analyst creates the requirements to develop a business analysis repository. In the requirements, the analyst describes a detailed workflow that includes appropriate stakeholders receiving email notifications of certain activities. The SharePoint team needs to know which activities should trigger the notification workflow. Which workflow trigger should the business analyst incorporate?

AChanges to test cases traced to requirements
BChange through project life cycle
CAny change to the requirements matrix
DChanges to stakeholder memberships
Question #27Part 1

Which of the following techniques contrasts the current and desired business views to analyze possible business changes?

ASWOT analysis
BImpact analysis SWOT analysis
CGap analysis
DTrend analysis
Question #28Part 1

Midway through the requirements gathering phase, a stakeholder informs the business analyst that a requested requirement does not address the solution. The stakeholder wants to know who made the request. The business analyst spends hours searching emails to identify the requestor. What should the business analyst have documented?

AThe source in the requirements traceability matrix
BThe source in the RACI matrix
CRoles and responsibilities in the RACI matrix
DSponsor approval in the requirements traceability matrix
Question #29Part 1

How can a SWOT analysis help when deciding between several possible options to address a business problem?

AIt can help the project sponsor to determine the valuation of each option.
BIt can help the stakeholders identify the strengths and weaknesses of each option.
CIt can help the product owner to determine opportunity cost of not choosing an option.
DIt can help the stakeholders to determine how to avoid the threats of each option.
Question #30Part 1

Two weeks prior to the delivery date, a customer changes the business requirements. What should the business analyst do?

ADeliver the existing product and then begin work on the requested changes.
BAsk the developers to implement the changes.
CTrace the requirements and measure the impact of the requested changes on the existing delivery date.
DSchedule a review by the change control board (CCB) to determine next steps.
Question #31Part 1

Which of the following can be used to determine if requirements align to the product’s objectives?

AActivity network diagrams
BFive Whys
CBusiness use cases
DContext diagrams
Question #32Part 1

A business analyst has been assigned to a project to implement a new phone system for a customer call center. The business analyst will need to create a business case. Which of the following components will the business analyst use as input to the business case?

AProduct scope
BWork breakdown structure
CProject timeline
DProject scope
Question #33Part 1

Which technique allows the collection of the maximum number of ideas on a subject from a group without considering the validity or practicality of the ideas?

APrototyping
BSurveying
CBrainstorming
DInterviewing
Question #34Part 1

The business analyst receives multiple changes from different stakeholders during the requirements gathering phase of a project. How should the business analyst track the requirements throughout the lifecycle of the project to secure the delivery of the expected solution?

ARecord all the requirements in a matrix, review it regularly, and get approval from stakeholders.
BPerform inspections through the lifecycle of the project to detect any gaps and adjust the requirements baseline.
CPlan regular meetings with stakeholders to review the requirements baseline update and to discuss changes.
DEstablish a risk traceability matrix and designate someone to manage each risk with the appropriate response.
Question #35Part 1

When a business analyst uses subject matter experts to define roles and identify influencers, which project artifact is created or updated?

AStakeholder management plan
BRACI matrix
CStakeholder register
DSWOT analysis
Question #36Part 1

Which of the following would be the best practice in product validation?

AThe evaluation criteria should be the same as what was used to measure the requirement.
BThere should be two separate measurements for evaluating each functional requirement.
CThe measurement of the requirement should be based on the average of two or more evaluations.
DTwo or more testers should test the product using the same test cases so that their evaluations are consistent.
Question #37Part 1

An organization is evaluating the possibility of conducting business internationally. Which factors should be investigated at the onset of the initiative?

ADeliverables to be produced
BExternal dependencies
CImpacts on requirements baseline
DChange control processes
Question #38Part 1

A major stakeholder wants to know how the implementation of new features in the development of a product is progressing. Which of the following should be reported to the stakeholder?

ANumber of requirements tested and approved
BDistribution of project changes
CRequirements status during the project development cycle
DNumber of requirements approved vs. number of requirements rejected
Question #39Part 1

A business analyst captures an application’s current limitations and consults with end users to identify new features for the next version. What can be used to analyze this information and determine project scope?

ARoot cause analysis
BCapability table
CAs-is process
DRequirements traceability matrix
Question #40Part 1

A key component of the business analyst’s role during acceptance testing is to:

Adelegate execution of acceptance testing and defect identification to users.
Bexecute all acceptance tests on behalf of the user community.
Cact as a resource only when users encounter difficulties while performing tests.
Dassist the quality assurance department by defining acceptance criteria.
Question #41Part 1

The technology department identified a defect in the company’s software, which leads to an increase in human resource requirements to perform manual transactions as a workaround for tasks that should have been automated. The company begins losing money, so it hires a business analyst to produce a business case that outlines the problem/opportunity, potential options, and a recommendation for how to proceed. Which of the following analyses must the business analyst perform in order to complete the business case and arrive at a solid recommendation?

ASWOT
BCost-benefit
CRisk
DGap
Question #42Part 1

Company A would like to enter into a new market. The business analyst has been assigned to a project for which nobody in Company A has any prior experience. The project manager has asked the business analyst to assist in resource planning. What should the business analyst recommend to the project manager?

AAsk the sponsor for more resources.
BReview the business case to reconsider the project.
CAsk the developer’s team manager for more resources.
DHire external subject matter experts for the core project team.
Question #43Part 1

A new project’s goal is to replace an existing system. What is an input into solution evaluation and decision making in this context?

ACost-benefit analysis of the existing system
BNew solution design specification
CCustomer metrics on the existing system
DTechnical readiness of the development team
Question #44Part 1

The project manager is beginning to prepare for a test readiness review with the customer. The project manager knows that the customer will want a summary of requirements that have been rejected or deferred. The project manager has requested that the business analyst provide a list of rejected and deferred requirements. What should the business analyst have done to complete this request?

ALimit the number of rejected requirements on the project.
BSet up a change control board to track the number of rejections.
CTrack rejected requirements in the system requirements verification matrix.
DSpend more time up-front reviewing the requirements to limit rejections.
Question #45Part 1

What should the business analyst do to ensure that all requirements meet a quality checklist before the development and testing phase?

ANegotiate with the client to standardize the requirements.
BAssign a verification method to each requirement.
CValidate the requirements deemed important by the stakeholders.
DObtain approval from engineering for partial testing of the requirements.
Question #46Part 1

A company is in the final phases of implementing a project for a client. Which tool or technique could the business analyst use to iteratively validate the solution?

AExpected vs. actual results
BExpected vs. actual costs
CSchedule variance
DQuality variance
Question #47Part 1

The client produced a specification for a new product to be developed by Company

AThe requirements matrix did not adequately track back to client requirements.
BThe product design was not properly reviewed by the quality department.
CRequirement changes were not properly identified in the project charter.
DThe product was not adequately tested in accordance with the test plan.
Question #48Part 1

A business analyst for Company A has been assigned to a three-year project to assist health insurance Company B with implementing and testing a new set of medical codes. The business analyst has identified many stakeholders who will participate in the project. For example, Company A will designate technical staff to write and code the requirements and provide a testing team to test the new functionality. The senior director of Company B will require weekly progress updates. The project manager from Company A will create project plans, schedule meetings, and provide meeting minutes. In the scenario above, what is the role of the technical staff and testing team from Company A?

AConsult
BResponsible
CAccountable
DInform
Question #49Part 1

Testing on a project has been completed. In order to proceed with deployment, a decision is needed. Who should the business analyst contact to review the testing results and get approval to proceed with deployment?

AThe tester identified in the testing strategy
BThe project manager identified in the project charter.
CThe project sponsor identified in the scope document.
DThe person identified in the RACI matrix.
Question #50Part 1

The business managers had clearly stated that the delivered website must simultaneously accommodate millions of users around the globe. However, within the first week of the production launch, the website crashes frequently. This situation could have been averted if:

Acritical business requirements were accommodated and tested.
Bessential product requirements were captured and tested.
Cquality attributes were captured and tested.
Dnonfunctional requirements were identified and tested.
Question #51Part 1

The best way to ensure the integrity of requirements is to:

Aimplement version control, maintain a history of requirements changes, and track the status of each requirement
Bestablish a requirements baseline, establish a change control board, and label each requirement uniquely
Cuse a requirements management tool, measure requirements volatility, and maintain a history of requirements changes
Destablish a change control board, track the status of each requirement, and use a requirements management tool.
Question #52Part 1

An insurance company embarks on a project to replace its current enrollment and billing software application, which will no longer be supported by the end of the calendar year. The new enrollment and billing application must be implemented before the current vendor contract ends. The business analyst gathers the initial requirements for the new enrollment and billing application. Based on the large volume of requirements, the business analyst realizes that the requirements will need to be prioritized. Which requirements prioritization method should the business analyst use for this project?

ATime-boxing
BRisk analysis
CWeighted ranking
DMoSCoW
Question #53Part 1

Projects have been managed well and completed on schedule and on budget. However, successful completion of the projects has not improved the company’s performance and profitability. Which of the following should have been implemented to ensure that the projects would improve the company’s performance and profitability?

AA risk plan
BA strategies and goals analysis
CA project management plan
DA review with appropriate stakeholders
Question #54Part 1

During the initial phase of a project, which technique could assist in identifying and categorizing the stakeholders?

AOrganization modeling
BPower/interest grid
CBusiness activity model
DRACI matrix
Question #55Part 1

When faced with a tight timeline, the project sponsor suggests that the project team start development without creating traceability artifacts. What should the business analyst do?

ANegotiate for a quick approval of a reduced set of traceability artifacts.
BExplain the value of requirements traceability.
CEliminate traceability activities for the project.
DStart development activities without traceability items.
Question #56Part 1

A business analyst assigned to review test output for a project realizes that an approved requirement has been missed. Which technique could the business analyst have used to ensure that requirements were delivered as stated?

AUse cased
BRequirements management plan
CTraceability matrix
DWork breakdown structure
Question #57Part 1

After implementation of the product, the customer reports defects. What is the best course of action to take?

AEscalate the issue to the project manager since the acceptance was given by the customer.
BDo nothing since the solution is now the responsibility of the operations manager.
CCompare reported defects with user acceptance test results.
DInvolve the end users and plan a new round of acceptance tests to check the gaps.
Question #58Part 1

A company has just finished the development work for a new software sales tracking application and is in the process of validating that the new application meets all of the acceptance criteria defined for the business requirements. During the validation process, a stakeholder discovers that the application does not provide the selection criteria needed to produce the sales volume reporting required by the company’s financial department. The business analyst for the project determines that the selection criteria needed was not specified in the system requirements or design specifications. Which of the following tools and/or techniques might be used by the business analyst to determine how the selection criteria requirement was missed?

ARoot cause analysis, fishbone diagram, and/or the Five Whys
BScope modeling, Ishikawa diagram, and/or the Five Whys
CRoot cause analysis, problem tracking, and/or benchmarking
DCause and effect diagram, brainstorming, and/or the Five Whys
Question #59Part 1

A major stakeholder of a project is surprised to learn that a particular requirement was not implemented during the latest launch. The business analyst tells the stakeholder that the requirement status was changed to “deferred”. What could have prevented the stakeholder from being surprised about the status change?

AThe status should have been reviewed prior to project launch.
BThe status should have been communicated to all project stakeholders.
CThe status should have been updated in the traceability matrix.
DThe status should have been communicated to the requirement’s source.
Question #60Part 1

Last year, a company registered a high number of complaints about its customer service. Which of the following tools or techniques can help to identify the high-priority changes needed to improve that service?

AA work breakdown structure analysis of the service
BA cause-and-effect diagram
CA Pareto analysis
DA flowchart of the service
Question #61Part 2

The project sponsor needs to know which requirements will be implemented. Which of the following would be the most valuable for a business analyst to provide?

ARequirements baseline document
BRequirements management plan
CRequirements impact analysis
DRequirements traceability matrix
Question #62Part 2

A business analyst has received a test result report that shows evidence of defective functionality. The business analyst checks the test result again and verifies that the functionality behaves according to the requirements. At this point, the business analyst should first:

Alet the users decide if the test result is acceptable.
Bchange the requirement according to the test result.
Cverify that the test case is incorrect.
Dask the tester to perform the test again.
Question #63Part 2

A project that was ongoing well for the last few months has encountered a situation-regulatory authorities have deemed that the project does not meet their requirements. Although regulatory requirements were identified during an earlier phase of the project, there is no substantial evidence to prove that the requirements were formally rejected. This could have been avoided if:

Athe customer met with regulatory authorities to verify that their requirements were also considered.
Ba change control process for requirements and their statuses was followed.
Cthe project manager circulated the meeting minutes after the discussions with all the attendees.
Dthe project team documented customer requests and obtained sign-off.
Question #64Part 2

Company A has initiated a project to update their online ordering system. The business analyst has noticed that the purchasing department, a primary stakeholder, is excluded from the list of stakeholders. In which reference material can the business analyst find information about the missing project stakeholders?

ABusiness analyst communication plan
BBusiness case
COrganizational chart
DBusiness analysis plan
Question #65Part 2

A startup company sells organic vegetable and fruit smoothies. Management is tracking a rapid decrease in sales of their best-selling juice, so they contract a business analyst to identify solutions in order to increase sales by comparing similar products offered by competitors. Which technique or tool should be used?

ATrend analysis
BBenchmarking
CCompetitive analysis
DFocus group
Question #66Part 2

How should a business analyst determine whether a solution satisfies business requirements?

ABy conducting a brainstorming session with end users
BBy evaluating the solution against the project charter
CBy reviewing the results of user acceptance testing
DBy reviewing the traceability matrix
Question #67Part 2

A new product was designed and delivered to the customer. The product exceeded customer expectations but did not meet the baseline budget for the product. What could be the issue?

ARisks identified in the risk management plan were not addressed properly.
BRequirements were not properly traced and monitored.
CThere is no issue since the product exceeded the customer expectations.
DThe sponsor approved the release of the product without reviewing the budget.
Question #68Part 2

A project team delivers a solution based on the approved requirements and is confident that it meets the defined acceptance criteria. What should the business analyst do to obtain signoff?

AContact the sponsor
BNo signoff is necessary
CRefer to the RACI matrix to identify who is responsible for signoff.
DContact the stakeholder who provided the majority of requirements in the traceability matrix.
Question #69Part 2

Which function involves auditing both the quality requirements to resolve discrepancies and the results of quality control measurements to ensure that appropriate quality standards and operational definitions are being used?

AQuality management
BQuality assurance
CQuality assessment
DQuality control
Question #70Part 2

What should the business analyst do during the first steps of a project?

AAlign the sponsor expectations along the project goals.
BIdentify stakeholders and their interests.
CIdentify the classes of users and their requirements.
DEvaluate the sources for requirements and prioritize them.
Question #71Part 2

A new business analyst has taken over on a project that is in the development phase. The project manager is looking for an update on requirements status. What should the business analyst use to help communicate the status?

ABusiness analysis plan
BTraceability matrix
CProject charter
DCommunication plan
Question #72Part 2

The project team has all the document control process and versioning in place to capture the requirements changes. The team ensures that the change is documented in the scope document, resulting in the changed work breakdown structure (WBS) and schedule. However, a key requirement was not implemented in the release. Which is a possible reason why the requirement was not implemented?

AThe requirements management plan was not updated with the change.
BThe requirements traceability matrix was not updated with the change.
CThe scope management plan was not updated with the change.
DThe schedule management plan was not updated with the change.
Question #73Part 2

In order to reduce product and project risk for a large, complex project, a business analyst is asked to help develop a change process that includes formal authorization and tracking throughout the life cycle of the project. The business analyst needs a capability that will help ensure that the product conforms to approved requirements, changes can be documented, and the status of each change can be reported. What should the business analyst use?

AContext models
BWork breakdown structure
CConfiguration management system
DTraceability matrix
Question #74Part 2

A few months into a project, the business analyst determines that the costs are exceeding the perceived benefits. The business analyst wants to address the possible risks of having to cancel the product. Which of the following documents should be used?

AStakeholder impact matrix
BProject charter
CBusiness analysis plan
DBusiness case
Question #75Part 2

During a requirements workshop, sponsors and managers from different departments express varying points of view and priorities about the product’s functions and requirements. The business analyst struggles with facilitating the group to reach an agreement. What should the business analyst have defined to avoid this?

ADecision-making process in the business analysis plan
BDecision-making process in the project management plan
CCommunications approach in the business analysis plan
DCommunications approach in the project management plan
Question #76Part 2

A business analyst is discussing the acceptance criteria for a new measurement system with the operations manager. The operations manager is particularly concerned about the accuracy of the new system because mistakes in data measurements could be extremely costly to fix. Which of the following is the best strategy to define the appropriate acceptance criteria?

AQuantify the risks associated with the measurement errors and update the risk register.
BClearly define the maximum acceptable error rate for the new system.
CAsk the operations manager to formally accept the requirements documents.
DPlan a training session for the new system before it is handed over to the operations manager.
Question #77Part 2

The requirements baseline is ready for sign-off when the requirements are:

Ajustified, clear, consistent, and verified.
Bconsistent, analyzed, complete, and validated.
Ccomplete, clear, verified, and adopted.
Dclear, consistent, complete, and validated.
Question #78Part 2

A business analyst has incorporated all the relevant feedback from stakeholders in the business analysis plan. Which next step should the business analyst take?

AStart documenting requirements
BStart implementing the project.
CStore the document for safe keeping.
DObtain approval on the plan.

📢 Unlock Full Access to Success!

"The content displayed here is a promotional preview and contains only 50% of the actual exam database. To access the complete set of updated questions, please upgrade to the Full Version."

👉 Click the button and follow the instructions to secure your full access immediately!