Welcome to awslagi.com – Sharing AWS, Anthropic, Google Cloud, Microsoft Azure IT Exams. It's free for all!

Certified Tester Advanced Level Test Automation Engineering

Automate the future of quality by mastering the architecture and engineering of Test Automation.

4.8★★★★★(257 ratings)
12,985 studentsIntermediate
This advanced certification validates your ability to design, develop, and maintain high-performance test automation frameworks. You will learn about automation architecture, tool selection, and how to integrate automation into the CI/CD pipeline for maximum efficiency. Become a leader in the fast-growing field of automation. This credential distinguishes you as a specialist engineer, qualifying you for high-paying roles in Test Automation and DevOps-driven software development suites.

What you'll learn

  • Test automation architecture
  • - Tool evaluation and selection
  • - Building maintainable automation
  • - Integration with CI/CD flows
  • - Managing automation projects

CTAL-TAE

Lectures1
Questions60
Duration30 week
Students12,985

$20.00

Full Free Question Bank (60 Questions)

Certified Tester Advanced Level Test Automation Engineering (CTAL-TAE) Practice Questions & Verified Answers

Click any option to test your knowledge, or reveal the verified answer and detailed explanation below each question.

Question #1Part 1Introduction and Objectives for Test Automation

Which of the following is regarded as a disadvantage of test automation?

AAutomated exploratory testing is difficult to implement.
BTest automation can be a distraction from the objective of finding bugs.
CTests are more likely to have operator errors.
DSlower feedback on the quality of the system.
Question #2Part 1Introduction and Objectives for Test Automation

Which of the following is a key success factor for any significant automation project?

AThe TAA must be designed for testability.
BThe TAA is self-documenting.
CThe SUT must be designed for testability.
DThe SUT is self-documenting.
Question #3Part 1Implementing Test Automation

You are a TAE responsible for a TAS used across several products, each with complex UIs. It has been decided that every radio button in one product will be changed to a checkbox; checkboxes have not previously been used in the UI. While updating the TAS to align with this change, which **TWO** actions would be **MOST** appropriate?

Aa and c.
Bb and c.
Cb and d.
Dd and e.
Question #4Part 1Test Automation Reporting and Metrics

Your TAF produces detailed test logs for each test it runs. Because data-storage capacity in the test environment is limited, after every run it is necessary to remove unneeded detail from logs for tests that passed and transfer the data that must be retained elsewhere. What is theBESTway to accomplish this?

ADo it manually, so that selection of the data to be kept is under human control.
BReplace the logs with videos of UI activity that your test automation tool can take.
CReplace your current tool with another tool whose logs will need less storage space.
DDo it automatically with a script that can be run by your test automation tool.
Question #5Part 1Verifying the Test Automation Solution

Which of the following should be performed when checking the composition of the test suite?

ACheck and verify the use of any new features in the current version of the TAF.
BCheck that the tests are linked to the correct versions of the TAF and SUT.
CCheck that the test results are always the same, i.e. that the tests are repeatable.
DCheck and consider the effects of intrusiveness of the automated test tools.
Question #6Part 1Continuous Improvement

You have been recruited as a TAE by a large travel agency and are now responsible for a mature TAS dedicated to functional testing of the company’s booking system, which covers flights, hotels, and packaged holidays. The application has a complex UI and extensive functionality. It is under continual maintenance and enhancement by an agile team that adds tests to the regression test suite at the end of each iteration. The TAS supports structured scripting, implemented to a high standard with a well-managed script library and minimal code duplication. The TAA will not support more advanced scripting techniques. Although the test automation achieved so far was initially well received, it is now receiving increasing criticism. It is considered old-fashioned and poorly documented, and in particular: - test script maintenance overhead is becoming excessive because test analysts frequently want data values changed; - test analysts complain that a new test similar to an existing one, except for data values, requires a new high-level script and that they must ask a technical test analyst to create it for them; - the nightly full regression run takes a long time, and there is a risk that as more tests are added it will soon exceed the available window; - some tests fail frequently because of a slow response from the SUT; - some transactions are difficult to verify because they depend on variables that cannot be seen through the SUT UI; - the TAF UI is difficult to learn. The SUT architect is planning a major new release and has offered to include features that enhance its testability. You already have plans to address items 1, 2, and 3 on the list, so you are now considering how to mitigate items 4, 5, and 6. Which TWO improvements will BEST address items 4, 5, and 6?

Aa and b.
Ba and c.
Cb and e.
Dd and e.
Question #7Part 1Continuous Improvement

You have been recruited as a TAE by a large travel agency and are now responsible for a mature TAS dedicated to functional testing of the company’s booking system, covering flights, hotels, and packaged holidays. This application has a complex UI and substantial functionality. It is under continual maintenance and enhancement by an agile team that adds tests to the regression test suite at the end of every iteration. The TAS supports structured scripting, implemented to a high standard with a well-managed script library and minimal code duplication. The TAA will not support more advanced scripting techniques. The test automation achieved so far was initially well received, but is now receiving increasing criticism. It is considered old-fashioned and poorly documented and, in particular: 1. The test-script maintenance overhead is becoming excessive because test analysts frequently want data values changed. 2. Test analysts complain that a new test similar to an existing one, except for data values, requires a new high-level script and that they must ask a technical test analyst to create it. 3. The nightly full regression run takes a long time, and there is a risk that it will soon exceed the available window as more tests are added. 4. Some tests fail frequently because of a slow response from the SUT. 5. Some transactions are difficult to verify because they depend on variables that cannot be seen through the SUT UI. 6. The TAF UI is difficult to learn. Your new manager wants rapid improvements to address items 1, 2, and 3. She has accepted that the TAA may need enhancement to support those improvements. Which TWO improvements would be **BEST** in this scenario?

Aa and b.
Ba and d.
Cb and c.
Dc and e.
Question #8Part 1Continuous Improvement

You are a TAE responsible for a TAS used across several products, all of which have complex UIs. A substantial proportion of the automated tests fail regularly, usually for UI-related reasons. The required investigation and maintenance are significantly reducing team productivity and return on investment. You are seeking ways to improve the test cases in this TAS. Which of the following approaches would be **MOST** appropriate? - Artificial intelligence. - Test histograms. - Reliability growth modelling. - Schema validation. - Operational profiles.

Aa and b.
Bb and c.
Cc and d.
Dd and e.
Question #9Part 1Continuous Improvement

You are a TAE responsible for a TAS used across several products, each with simple UIs and a range of APIs. Automation of the regression test suites for these products is generally progressing well, with both repeatability and pass rates at high levels. These regression suites contain many tests, and the quantity of code written for them is substantial. You are seeking ways to improve the test cases in this TAS. Which approach would you use **FIRST**?

AArtificial intelligence.
BTest histograms.
CGrowth models.
DSchema validation.
Question #10Part 1Verifying the Test Automation Solution

Which assertion about static analysis isTRUE?

AIt can suggest areas where code could be better commented.
BIt can detect any security vulnerability in code.
CIt removes the need for manual code reviews.
DIt is more important for SUT code than for TAF code.
Question #11Part 1Verifying the Test Automation Solution

When investigating the cause of an intermittent failure, which action isMOSTlikely to be helpful?

AChecking the test data values.
BConsulting a business analyst.
CMonitoring execution time.
DMonitoring system resources.
Question #12Part 1Verifying the Test Automation Solution

What outcome may result from a high level of test-tool intrusion?

ACorruption of data in some test data sets.
BLack of repeatability of some test results.
CFailures that will not be seen in production.
DA greater need for configuration management controls.
Question #13Part 1Implementation and Deployment Strategies for Test Automation

You are a TAE for a software vendor that develops bespoke software. Your current project is developing a process-control system in which data from sensors on the factory floor and human input through a web-based front end undergo processing on backend platforms. This produces control instructions that are sent to the production line through a message broker. Your test environment includes all these components, including sensors running in a test harness. These sensors are third-party components still under development, so they are frequently upgraded. The message broker is also a new third-party component that continues to receive regular patches. This means the TAS must be reinstalled frequently, requiring substantial manual effort; on several occasions it was built incorrectly because components were missing and had to be rebuilt. Which action is MOST likely to resolve this issue with the TAS?

AAutomated installation from a central repository where component upgrades can be managed.
BStricter documentation and configuration management of the TAS components.
CConnectivity checks after installation to verify interoperability between the TAS and the sensors.
DFunctional testing of relevant TAS components before installation to verify their interoperability with any upgrade to the sensors.
Question #14Part 1Implementation and Deployment Strategies for Test Automation

You work for a company that develops a credit-checking software package. This product is available in three variants, each tailored to meet the lending-and-borrowing rules and attitudes of a particular group of countries. Each variant has two versions at any one time: the current live release and the next release under development. Each variant has its own test environment; these environments run on different platforms to reflect the diversity of real customer platforms. A single TAS meets the automation needs of all three variants, with configurable features that accommodate the platform differences. The SUT’s test requirements are expanding rapidly, and the TAS frequently requires enhancement to support them. The SUT’s platforms are also subject to change, because of vendor updates or a desire to evaluate different platforms. After every change, the TAS is reinstalled from a central repository using automated scripts that apply the configuration parameters for the target environment. After this, it has often been impossible to run tests correctly, or even at all, and the installation has had to be repeated once the cause was found. Which of the following actions are MOST likely to resolve this issue?

AInstall by copying a standard configuration of the TAS from the central repository.
BStricter documentation and configuration management of the TAS components.
CConnectivity checks after installation to verify interoperability between the TAS and the SUT platforms.
DNon-functional testing of TAS components before installation to verify their interoperability with their target platforms.
Question #15Part 1Test Automation Reporting and Metrics

Which items should be included in a report produced after a test suite is executed?

ATest results and a list of operational stakeholders.
BTest environment details and root causes of defects found.
CSUT information and TAS configuration details.
DTest results and test environment details.
Question #16Part 1Test Automation Reporting and Metrics

You work for a clothing retailer with large stores in many cities. For the first time, its TAS has been used for reliability and stress testing of the overnight batch processing that collects sales transactions from the stores and loads them into a data warehouse; functional-suitability tests have been reused for these runs. All tests completed normally, but their results have been unsatisfactory, and it has been difficult to understand the nature of the defect or defects causing the failures. What data, if added to the test logs, would be **MOST** likely to help with debugging in this situation?

Aa and d.
Bb and c.
Cc and d.
Da and e.
Question #17Part 1Verifying the Test Automation Solution

What does contract testing validate?

AThat data shared between services is consistent with specified rules.
BThat contractual provisions for supply of the SUT have been met.
CThat schema validation has been successfully performed.
DThat the service provider has defined the consumer’s expectations.
Question #18Part 1Preparing for Test Automation

At what point is automated API testingBESTcarried out?

ABy developers during their component integration testing.
BSplit across component integration and system integration testing.
CBy TAEs during their system integration testing.
DBy developers during their component testing.
Question #19Part 1Implementation and Deployment Strategies for Test Automation

When would you beMOSTlikely to store a test-environment configuration together with other testware?

AWhen one test environment is used in multiple projects.
BWhen there is only one test environment to be used.
CWhen one test environment is used in multiple TAFs.
DWhen there is only one configuration management system.
Question #20Part 1Implementation and Deployment Strategies for Test Automation

How would a feature-toggle configuration be used?

ATo identify the test data sets needed for a test suite.
BTo identify a test environment configuration.
CTo identify which test suites to execute.
DTo identify which oracle to use for verification.
Question #21Part 1Implementation and Deployment Strategies for Test Automation

Which statements about a continuous integration/continuous deployment (CI/CD) pipeline are **TRUE**? - The pipeline can contain configuration tests for the TAF/TAS. - The pipeline cannot contain configuration tests for the TAF/TAS. - Component and component integration tests should run separately. - The pipeline can contain system integration tests. - The pipeline cannot contain system integration tests.

Aa and d.
Bb and c.
Cc and d.
Da and e.
Question #22Part 1Implementation and Deployment Strategies for Test Automation

When a continuous integration/continuous deployment (CI/CD) pipeline is divided into build and deployment phases, which statements are **TRUE**? - Component and component-integration tests are part of the deployment phase. - System and higher-level tests may be included in the build phase. - Component and component-integration tests are part of the build phase. - System and acceptance tests may run in a separate pipeline. - System-integration tests cannot run in this type of pipeline.

Aa and b.
Bc and d.
Cb and e.
Da and d.
Question #23Part 1Test Automation Architecture

Which factor supports the maintainability of test automation solutions?

AHardcoded parameter values.
BKeyword-driven testing.
CTest-driven development.
DCommon naming conventions.
Question #24Part 1Implementation and Deployment Strategies for Test Automation

You are working as a TAE on a project to build a purchasing system. The main requirements for the system are to: - Allow users to enter details of items they want purchased and, using those details, create a purchase request. - Take each purchase request through a workflow that allows the requestor’s line manager to approve the request, reject it, or return it for clarification / modification. - Forward approved requests to the Purchasing Department. - Allow purchasers to find the best available supplier and place the request with that supplier as a purchase order. Requirement 1 has now been delivered and satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated. You have just run a pilot of the TAS on the implementation of Requirement 1, and several things went wrong: One test failed because required reference data was missing, and this failure plus several others were difficult to diagnose. Another test failed unexpectedly because an old version of the script was used. Which THREE measures could mitigate these risks during deployment?

Aa, b and d.
Ba, c and e.
Cb, c and d.
Db, d and e.
Question #25Part 1Test Automation Architecture

Which option correctly matches test-automation design principles and patterns to their characteristics? 1. Conceals implementation details and exposes only what testers require to create their test cases. 2. Creates a class file so locator updates must be made in only one location. 3. Incorporates the principle that components should be freely substitutable without adverse effects. 4. Adds a facade that stores user actions interacting with page objects. - a. Facade pattern. - b. SOLID. - c. Flow model. - d. Page object model.

A1b, 2a, 3c, 4d
B1a, 2d, 3b, 4c
C1c, 2d, 3а, 4bD.1d, 2b, 3а, 4 с
Question #26Part 1Preparing for Test Automation

You are working as a TAE for a small start-up insurance broker, and your next project is a new system to generate motor insurance quotes. The project will use an Agile methodology. The stakeholders are eager to put it into production, but they realistically recognize the need to allow sufficient time for thorough testing and to automate tests where appropriate. Which test-automation approach would be **MOST** suitable for this project?

AStructured scripting.
BData-driven testing.
CLinear scripting.
DKeyword-driven testing.
Question #27Part 1Test Automation Architecture

Which statement about layers in a test automation framework isTRUE?

AA TAF should have only a few layers in order to optimize efficiency.
BA TAF should have one layer for each different purpose in order to get the benefits of abstraction.
CA TAF should have only a few layers in order to minimize complexity.
DA TAF should have one layer for each different purpose in order to segregate the class files.
Question #28Part 1Test Automation Architecture

Which statement accurately describes the role of a Test Automation Architecture?

ASpecify the changes that will be needed to test processes and procedures.
BSpecify the changes that will be needed to the SUT to give full testability.
CSpecify the connections between the TAS and the test management and data management tools.
DSpecify the process that will be needed to select test automation tools.
Question #29Part 1Verifying the Test Automation Solution

You are working on a web-based application named Book Vault that enables people to upload books and place book orders. The application must be available in all major browsers. You have been testing the application manually, and management has asked you to consider automating some tests. You investigated several commercial and free tools that can automate tests at the web-browser level. One tool in particular meets your requirements, and you have implemented a trial version. You have basic programming skills, and the primary objective is to automate a few functional tests to determine whether the tool is compatible with the application and can recognize the objects and controls. Which scripting technique would be **MOST** suitable in this scenario to meet the objectives?

AStructured scripting.
BCapture-replay scripting.
CData-driven scripting.
DModel-based scripting.
Question #30Part 1Introduction and Objectives for Test Automation

When the SUT exposes interfaces that can be used to carry out actions on the SUT, what is this termed?

APortability.
BMaintainability.
CObservability.
DControllability.
Question #31Part 1Preparing for Test Automation

Your company is about to begin a project to replace an old sales and merchandising system with a new version based on modern platforms. The system's main requirements are: - Loading sales data, sent electronically from stores each evening, into a central database. - Producing sales reports for merchandisers, whose role is to manage stock levels in stores. - Producing forecast reports to predict future demand for each product, based on a combination of sales history and forecasting parameters. Merchandisers will enter the parameters through a browser-based front end, and the reports will be produced overnight. Users will be able to retrieve the reports, either on screen or in print, through an interactive feature. Requirements 1 and 2 were already fulfilled by the old system and will be rewritten in the new system with minor functional changes. As before, the sales data will be loaded in an overnight batch run. The old system has experienced problems during peak periods when this run took longer than scheduled, preventing dependent jobs from completing before the next working day. The Data Centre manager requires the new system's overnight batch runs, including the new reports, to take 10% less time than the old system so that all jobs can complete. Requirement 3 is new. The functionality provided by the UI will be simple, and the Sales & Merchandising manager requires it to be easy to use. Data for testing the reports will be extracted from the old production system and anonymized before use. The system will be developed using an Agile lifecycle with fixed-length iterations; this will be the first full deployment of this methodology, which has just completed a successful pilot. It is a relatively simple development and is expected to be completed in three releases, each taking approximately 2 months. You are an experienced TAE recruited to implement test automation on this project and have begun evaluating candidate tools to automate functional and some non-functional testing. It is already clear that no single tool will meet every requirement, and that the developers' existing Integrated Development Environment will meet their testing automation needs. The TAS will need to support CI/CD. When reviewing your tool comparison table, which TWO tool capabilities will be MOST beneficial for this project?

Aa and d.
Bb and c.
Cc and d.
Da and e.
Question #32Part 1Preparing for Test Automation

Your company is preparing to replace an old sales and merchandising system with a new version based on modern platforms. The system’s primary requirements are: - Loading sales data, electronically sent from stores every evening, into a central database. - Producing sales reports for merchandisers, whose role is to manage store stock levels. - Producing forecast reports that predict future demand for each product from a combination of sales history and forecasting parameters. Merchandisers will enter the parameters through a browser-based front end, and the reports will be generated overnight. Users will be able to retrieve the reports interactively, either on screen or in print. Requirements 1 and 2 were already fulfilled by the old system and will be rewritten in the new system with minor functional changes. As before, sales data will be loaded in an overnight batch run. At peak times, the old system has had problems when this run took longer than scheduled, preventing dependent jobs from completing before the next working day began. The Data Centre manager requires the new system’s overnight batch runs, including the new reports, to take 10% less time than the old system so that all jobs have time to complete. Requirement 3 is new. The UI functionality will be simple, and the Sales & Merchandising manager requires it to be easy to use. Test data for the reports will be extracted from the old production system and anonymized before it is used. The system will be developed using an Agile lifecycle with fixed-length iterations; this will be the first full deployment of this methodology, which has just completed a successful pilot. It is a relatively simple development and is expected to be completed in three releases, each taking approximately 2 months. Until now, the company has not automated test execution, but the Agile pilot identified this as a critical success factor. You are an experienced TAE recruited to implement test automation and are now considering the required TAS. Which option includes the TWO MOST important considerations for determining the nature of the TAS needed for this project?

Aa, b and c.
Bb, c and e.
Ca, d and e.
Db, d and e.
Question #33Part 1Test Automation Architecture

Which factor supports the maintainability of test automation solutions?

AUse of logging.
BObject-oriented programming.
CHigh comment density.
DMethods with many parameters.
Question #34Part 1Implementing Test Automation

You are a TAE for a large insurance company that offers a broad range of products, including home, health, and motor insurance. Your next project is a major change to the existing system that processes policy claims. The project objective is to make the claim-authorization process more flexible according to policy type and claim nature, so that simple claims can be processed more quickly. It will use a hybrid methodology, with development and testing completed in 3-week iterations. The most important functional and non-functional tests for the existing system have been automated. The older tests use structured scripting, while the more recent tests have benefited from data-driven testing. Which automation approach for the system-level tests would be **MOST** suitable for this project?

AKeyword-driven testing.
BStructured scripting.
CTest-driven development.
DData-driven testing.
Question #35Part 1Preparing for Test Automation

What is a goal of automated testing in a local development environment?

ATo verify component functionality.
BTo build the software and check correctness of the build.
CTo verify integration with other systems.
DTo assess performance efficiency.
Question #36Part 1Preparing for Test Automation

Which component of the SUT can be modified to better support test automation?

ASystem environment variables.
BOperating system version.
CThe number of system features.
DInternet provider restrictions.
Question #37Part 1Preparing for Test Automation

What is a goal of test automation in a preproduction environment?

ATo verify component functionality.
BTo build the software and check correctness of the build.
CTo verify component integration.
DTo assess non-functional characteristics.
Question #38Part 1Test Automation Reporting and Metrics

The Test Automation Manager has asked you to propose a solution to collect metrics from the TAS that measure code coverage every time the automated regression test pack runs. The metrics must be trend-based so that the regression test pack’s scope continues to reflect enhancements to the SUT: coverage must not decrease and should ideally rise. The solution must be as automated as possible to prevent unnecessary manual effort and errors. Which of the following approaches would **BEST** satisfy these requirements?

ATest automation cannot measure code coverage for the SUT, only the code for the automation tools and scripts. The automated test cases would need to be run manually with a code coverage and reporting tool running in the background.
BThe automated testware would record overall code coverage for each run and add the figure to a new row in a pre-formatted Excel spreadsheet. You would then present the spreadsheet to stakeholders so they could look for changes in coverage.
CThe automated testware would record overall code coverage for each run, export the data to a pre-formatted Excel spreadsheet that automatically updates a trend analysis bar chart for you to distribute to stakeholders.
DThe automated testware would record the pass/fail rate of each regression test case, export the data to a pre-formatted Excel spreadsheet that automatically updates a trend analysis success rate bar chart and emails it to stakeholders.
Question #39Part 1Test Automation Architecture

WhichONEof the four layers in the test automation architecture offers an optional capability?

ATest generation layer.
BTest definition layer.
CTest execution layer.
DTest adaptation layer.
Question #40Part 1Implementation and Deployment Strategies for Test Automation

You work as a TAE on a project to develop a purchasing system. The key requirements for the system are to: - Allow users to enter the details of items they want purchased and, from those details, create a purchase request. - Take every purchase request through a workflow that enables the requestor’s line manager to approve the request, reject it, or return it for clarification / modification. - Forward approved requests to the Purchasing Department. - Allow purchasers to locate the best available supplier and submit the request to that supplier as a purchase order. Requirement 1 has now been delivered and satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated. You now plan to use the implementation of Requirement 1 as a pilot for the TAS. Which TWO objectives are MOST appropriate for this pilot?

Aa and d.
Bb and c.
Cc and d.
Da and e.
Question #41Part 1Verifying the Test Automation Solution

New features have been introduced for the current release of an SUT. Which action would **NOT** be appropriate for the TAE to take when evaluating the impact on the TAS?

AGather feedback from the Business Analysts to determine if the current TAS will meet the needs of the new features.
BReview existing keywords to see if they need to be modified.
CRun existing automated tests against the updated SUT to verify and record any changes to their correct operation.
DEvaluate compatibility with existing test tools and, where necessary, identify alternative solutions.
Question #42Part 1Introduction and Objectives for Test Automation

Which of the following is considered anADVANTAGEof test automation?

AThe ability to automate tests that cannot be run manually.
BIt is cheaper and quicker to develop and maintain than manual testing.
CAutomated tests will find more defects than manual testing.
DAutomated tests are more flexible, allowing updates to be easily made when the SUT changes.
Question #43Part 1Continuous Improvement

Your TAS has operated successfully on a Windows/GUI-based SUT for several years. To maintain business as usual, the SUT has changed only minimally during that time, with six-monthly waterfall releases delivering minor enhancements and bug fixes. The TAS has remained completely unchanged throughout this period. The current SUT project will use Scrum to deliver a more modern, competitive user interface. It is at the release-planning stage, with an agreed release backlog and an outlined set of sprints. The shift from long waterfall releases to shorter sprints has prompted a review of the current TAS to ensure that it is robust and fully optimized for the timescale challenges of the new project. What two steps would be **BEST** to undertake during the review?

Ac and d.
Bb and c.
Ca and b.
Dd and e.
Question #44Part 1Preparing for Test Automation

When selecting an automation tool, which option would beBESTfor automation testers who possess programming skills?

AA low-code or no-code tooling solution.
BA tool whose programming language matches that of the system under test.
CAvoidance of open-source automation tools.
DA commercial-off-the-shelf (COTS) tool.
Question #45Part 1Implementation and Deployment Strategies for Test Automation

You are testing a major enhancement to an air traffic control user interface. You have access to a sophisticated pre-production test environment, created specifically for large-scale automated regression, performance, and security testing. The regression-testing window is limited and must conclude successfully, with no major regressions outstanding, before non-functional testing begins. You have used the same version of the TAS for the last few releases, completing the automated regression test suite in a single overnight run each time. However, because of the latest SUT enhancements, you believe there is a risk that the test suite will no longer finish overnight and could therefore delay performance and security testing. Which option would be the **BEST** and **MOST** cost-efficient approach to mitigate this risk?

ACreate a mirror of the pre-production test environment and split the regression test suite to run in parallel across the environments.
BSplit the regression test suite into multiple parts, running in the environment across consecutive nights.
CAnalyse the regression test suite and remove test coverage duplication and redundancy.
DIntroduce better coding practices for the automation scripts, including coding guidelines, reviews and improved static analysis.
Question #46Part 1Continuous Improvement

You have implemented a keyword-driven scripting framework that uses a test-execution tool to run tests. It has been used for the past year, and every team now uses this framework as the standard method for test execution. The teams work on different aspects of the SUT, and all have experienced significant benefits from using this scripting framework. However, closer examination has revealed numerous cases in which teams need to test the same functionality but use different keywords. One objective for improvement is to establish consistency across the teams. What is the **BEST** way to address this situation?

AMove to a model- based approach to scripting where the models include the keywords.
BDo nothing, each team are working in isolation and they are all experiencing significant benefits in the way they are currently working.
CProvide each team with a set of guidelines and naming conventions for keywords.
DCreate a central library of keywords and associated definitions for each team to use.
Question #47Part 1Verifying the Test Automation Solution

Which of the followingcorrectlyexplains how automationshouldbe used for confirmation testing?

AConfirmation tests are not good candidates for automation as they are not designed to run many times.
BConfirmation tests should only be automated if they fail to pass on the first attempt.
CConfirmation tests can be automated and incorporated into an automated regression suite to show whether defects that were previously fixed re-occur.
DA confirmation test should only be automated after it has been run manually.
Question #48Part 1Preparing for Test Automation

You are implementing a TAS for a system that has been live for more than three years and uses a hybrid waterfall-and-agile lifecycle. Production updates occur monthly. There is no test team: developers design and run unit and integration tests with some automation, while business analysts design and run manual system-level tests. Although the system has been relatively stable for most of its life, no formal test process exists. Unfortunately, the two most recent monthly releases caused problems, with regression defects discovered in production. Your priority is to automate functional regression tests at the system level, and project stakeholders have approved the budget. The Business Analysts have identified the test cases most appropriate for regression. You must use the organization’s long-standing commercial automation tool, which has passed a proof of concept on the platform for the system in question. Which of the following suitability criteria requires the **MOST** attention for the TAS?

ATechnical planning in support of ROI analysis.
BFrequency of use.
CCompatibility and tool support.
DMaturity of the test process.
Question #49Part 1Implementation and Deployment Strategies for Test Automation

You are a TAE at a software house that delivers quarterly releases of its software to customers. Many different versions of the SUT must be tested at the same time by different test teams. Your TAS is complex, and you must ensure that it stays consistent across the different SUT environments. What is the **BEST** and most efficient way to ensure that every test team uses the same TAS version to test the different SUT versions?

ADue to the complexities involved and the high risks associated with these releases, it would be best to revert to manual testing.
BProduce comprehensive documentation of the TAS, installation and usage guidelines and provide training for each team member.
CInstall the TAS is a central repository and have an automated installation and configuration of the TAS from this repository to each of the SUT environments.
DDevelop a tool to track historical test results across the different SUT environments and look for trends.
Question #50Part 1Preparing for Test Automation

Your project is moving from manual to automated testing. You have chosen to implement a pilot project so that lessons learned can guide future time estimates and schedules. Which two of the following are the types of test cases **MOST** suitable for a test automation pilot project? - High-added-value test cases that require little effort to automate. - Tests that are run infrequently, as these will be simpler to automate. - Reliability test cases that can demonstrate added value soon. - Technically challenging test cases to provide the best validation of manual test conversion. - Tests that are least important to the business, as these are safer to trial.

Aa and b.
Ba and c.
Cb and d.
Dc and e.
Question #51Part 1Preparing for Test Automation

What is considered good practice when automating a manual regression test suite?

ATest data shared between tests should, where feasible, be stored and accessed from a single source to avoid duplication or introduction of error.
BAll existing manual tests should be decomposed into several smaller automated tests to reduce functional overlap.
CRemove inter-dependencies between tests to reduce automation failures and costly error analysis.
DOnce a manual test has been automated, execute it immediately to identify whether it operates correctly.
Question #52Part 1Continuous Improvement

You are the TAE for an Agile project with six sprints in the current release. Sprint five is in progress, and the automated regression suite is scheduled to begin later today. You have reviewed the automated-regression results from the previous four sprints again. You find that two test cases both passed in sprints 1 and 4, but failed in sprints 2 and 3. The failures were not detected and consequently remain unexplained. Both test cases are tightly coupled to other tests in the suite. What action **SHOULD** you take?

ARun the regression suite as planned and see if the tests fail again. If they do, determine the cause of failure.
BRemove the test cases from the regression suite and refer them to the test designer for manual testing for future sprints.
CQuarantine the test cases, run the regression suite without them, and perform root cause analysis on the test cases in parallel.
DRun the test cases manually now. If they still pass, keep them in the regression suite, if they fail perform root cause analysis.
Question #53Part 1Implementation and Deployment Strategies for Test Automation

Your company is new to test automation and, as TAE, you have designed a TAS that successfully supports the SUT for the current project. Other systems are currently in operation that have been tested manually, and more systems are planned over the coming years. Based on this success, your company requires that test automation be rolled out to other current and future SUTs, with consistency as a key objective. Which of the following is the **BEST** way to achieve this?

ADesign a new TAS for each SUT, and manage each one through a dedicated automation support team.
BInstall the current TAS into a central repository so that other tests on different SUTs use the same version of the TAS.
CCheck for correct connectivity to internal and external systems to ensure that the TAS has been installed and configured correctly for each SUT.
DDevelop a tool that keeps track of automation failures across the different SUTs and produces regular reports to stakeholders.
Question #54Part 1Test Automation Reporting and Metrics

If you are tracking how often test automation code reports a defect that is not actually a defect, which metric are you collecting?

ATool scripting metrics.
BAutomation code defect density.
CTrend metrics.
DThe number of false-fail results.
Question #55Part 1Test Automation Reporting and Metrics

Which of the following explains how a test execution report is likely to be used?

ATo understand which test step caused the failure in a test case.
BTo identify problematic areas of the SUT by keeping a history showing which test cases fail the most.
CTo measure coverage of the test basis by a test suite.
DTo record how a test case failure has been fixed.
Question #56Part 1Test Automation Architecture

Which are the four horizontal layers of the gTAA?

ATest adaptation, test execution, test design, test definition.
BTest generation, test execution, test definition, test APIs.
CTest generation, test definition, test execution, test adaptation
DTest definition, test execution, test reporting, test adaptation
Question #57Part 1Preparing for Test Automation

You have evaluated a new tool that supports modelling the SUT and can subsequently generate test cases manually or automatically. You have persuaded your managers that conducting a pilot project for this tool is the best way forward. You must choose a project for the pilot. The available projects are: - **Project A:** A two-year project that is critical to the business and is currently in the requirements phase. This project is for a new e-commerce website and is mainly developed “in-house,” although the payment system is being developed and delivered by a 3rd-party provider. - **Project B:** A safety-critical application for software that drives and parks cars. - **Project C:** An upgrade to an important HR timesheet-tracking application that will be available as desktop and mobile applications. This is a one-month project developed in-house. - **Project D:** The payment system from Project

AProject A because it is a large project and has high visibility and is in the requirement phase.
BProject B because it is a safety critical system and has high visibility.
CProject C because it is a short, low priority project but is important.
DProject D because it is a small part of a larger project and will help show the tool’s capabilities.
Question #58Part 1Verifying the Test Automation Solution

You executed an automated test suite for a product released into production. Even though every test passed, a major production failure occurred in an area that your automated tests covered well. You run the automated tests again, and one test now fails; this failure is directly related to the reported production defect. You decide to run the automated test suite once more on the same version of the SUT, and the test now passes. What **SHOULD** you do now to verify the validity of the automated tests?

ARemove the intermittently failing test from the test suite and investigate the reason why the test sometimes passes and sometimes fails.
BCheck that the production defect that was reported was an actual defect.
CRun the automated test suite again and if the test now passes - do nothing.
DRemove the intermittently failing test from the test suite and re-run the automated test suite again.
Question #59Part 1Continuous Improvement

The functional-regression test automation suite ran successfully during the first two sprints, with no failures encountered in its runs. The automation suite records every test case as either ‘pass’ or ‘fail’ and includes excellent recovery capability. In the third sprint, the TAS log reported several test cases as ‘fail’. You investigated every test case and determined that most failures resulted from a defect in a keyword script rather than in the SUT. For cases in which the failure was in the SUT, defect reports were raised, but developers returned several of them requesting more information to reproduce the problem. Which additional TAS log items **SHOULD** be added to **BEST** improve failure analysis and defect reporting in future sprints? - a. Dynamic measurement information about the SUT. - b. A ‘TAS error’ status, in addition to ‘pass’ and ‘fail’, for each test case. - c. A colour-coding scheme in which ‘pass’ is red and ‘fail’ is green. - d. A counter that determines how many times each test case has run. - e. System-configuration information, including software/firmware and operating-system versions. - f. A copy of the source code for every executed Keyword script.

Aa and b.
Bd and e.
Ca and c.
Db and e.
Question #60Part 1Test Automation Reporting and Metrics

You have been asked to implement test automation for a project that is failing to meet its deadlines. Further analysis shows that the manual testers cannot keep pace with testing new features because regression testing takes 75% of their time. Consequently, new features are released with many defects, and customers are complaining about the quality. Given this information, which metric **SHOULD** you track to demonstrate the value of test automation for this project?

APercentage of code covered by the test automation.
BEquivalent Manual Test Effort for the automated tests.
CNumber of defects found by test automation.
DPercentage of builds accepted/rejected by the automated tests.

📢 Unlock Full Access to Success!

"The content displayed here is a promotional preview and contains only 50% of the actual exam database. To access the complete set of updated questions, please upgrade to the Full Version."

👉 Click the button and follow the instructions to secure your full access immediately!