Welcome to awslagi.com – Sharing AWS, Anthropic, Google Cloud, Microsoft Azure IT Exams. It's free for all!

Advanced Technical Test Analyst

Prove your technical depth in software engineering by mastering Advanced Technical Test Analysis.

4.8★★★★★(292 ratings)
16,896 studentsIntermediate
This advanced-level certification validates your skills in structural testing and non-functional quality assessment. You will learn about code coverage, static and dynamic analysis, and how to test for performance and security at the architectural level. Distinguished status as a technical professional. This credential is vital for those working on complex software architectures, qualifying you for technical lead and software engineering roles in mission-critical environments.

What you'll learn

  • Structural testing & code coverage
  • - Static and dynamic analysis tools
  • - Performance & reliability testing
  • - Security & maintainability analysis
  • - Automation architecture basics

ATTA

Lectures1
Questions32
Duration30 week
Students16,896

$20.00

Full Free Question Bank (32 Questions)

Advanced Technical Test Analyst (ATTA) Practice Questions & Verified Answers

Click any option to test your knowledge, or reveal the verified answer and detailed explanation below each question.

Question #1Part 1Test Automation

The developers have proposed that test set A is sufficient to test the program shown: When test set A is executed through the program, which statements are exercised?

AAll
BAll, but statement 22
CAll, but statement 27, 28 and 29
DAll, but statement 22, 27, 28 and 29
Question #2Part 1Testing in Agile

When flying on an economy ticket, you might be upgraded to business class, particularly when you hold a gold card in the airline’s frequent-flier program. If you do not hold a gold card, you might be bumped from the flight when it is full and you check in late. This is illustrated in the following figure. Each box (statement) is numbered. Three tests have been run: - Test 1: A gold-card holder who is upgraded to business class - Test 2: A non-gold-card holder who remains in economy - Test 3: A person who is bumped from the flight What is the statement coverage for these three tests?

A60%
B70%
C80%
D90%
Question #3Part 1Requirements Engineering

The comment frequency for the code fragment is 13%. To which ISO 9126 quality attribute does a good comment-frequency level particularly contribute?

APortability
BMaintainability
CUsability
DEfficiency
Question #4Part 1Testing in Agile

A component has been assessed as highly critical. Which of the following structure-based test-design techniques delivers the highest level of coverage?

AStatement testing
BDecision testing
CCondition determination testing
DMultiple condition testing
Question #5Part 1Test Automation

What is the number of nesting levels in the code fragment?

A0
B1
C2
D3
Question #6Part 1Testing in AgileSelect 2

An embedded software company is considering improving the quality of its software components before delivery to the integration team. After reviewing various experience papers reporting a higher level of quality for software components, two main alternative techniques have been identified: static analysis and dynamic analysis. A detailed study is performed to decide which technique is most applicable and how they relate to one another. Which of the following are **TWO** key similarities between static analysis and dynamic analysis?

ABoth are performed using requirements as its major input document
BBoth are usually undertaken by integration testers
CBoth are usually undertaken by development during coding and unit testing
DBoth are related to reviews
EBoth usually use a tool
Question #7Part 1Requirements Engineering

As part of a risk analysis, technical risks are assessed. WhichTWOfactors influence technical risk?

AComplexity of technology
BFrequency of use of the affected failure
CInterfacing and integration issues
DDamage to image
ELack of reasonable workaround
Question #8Part 1Testing in Agile

Consider this fault attack: “Force all possible incoming errors from the software/OS interfaces to the application.” Which type of failure are you seeking when performing this attack?

AApplication crashes when unsupported characters are pasted into an input field using the windows clipboard
BFront page of the application has incorrect spelling of the company name
CApplication fails to display financial numbers in the correct currency format in reports
DApplication miscalculates total monthly balance due on credit cards
Question #9Part 1Testing in Agile

How many test cases are required to achieve 100% decision coverage?

A1
B2
C3
D4
Question #10Part 1Testing in Agile

How many test cases are required to obtain 100% statement coverage?

A1
B2
C3
D4
Question #11Part 1Testing in Agile

Which specification-based technique could be used to improve coverage for this code fragment?

ABoundary value analysis
BExploratory testing
CState transition testing
DUse case testing
Question #12Part 1Testing in Agile

Consider this code fragment: Assume that, in the options below, each parenthesized set of three numbers represents the inputs for a test case: the first number represents variable "a", the second represents variable "b", and the third represents variable "c". Which of the following provides a set of test-case inputs that achieves 100% decision coverage for this code fragment using the minimum number of test cases? If (a>b) and (b>c) then - b = (a+c)/2 endif

A(5, 3, 2)
B(5, 3, 2); (5, 4, 0)
C(5, 4, 0); (4, 5, 0)
D(4, 5, 0); (5, 4, 5)
Question #13Part 1Test Automation

For the control flow, which labelling is correct? i ii iii

ANodes Link Region
BNodes Region Link
CRegion Link Nodes
DRegion Nodes Link
Question #14Part 1Testing in Agile

Which of the following provides a valid method for calculating cyclomatic complexity?

ANumber of decisions + 2
BNumber of enclosed regions - 1
CNumber of statements - 2
DLinks - Nodes + 2
Question #15Part 1Testing in Agile

What statement-coverage value is achieved by test case 1 in test set A?

A? 75% (21/28)
B? 78% (22/28)
C? 85% (24/28)
D? 90% (25/28)
Question #16Part 1Testing in Agile

WhichTWOadditional structure-based test design techniques can be used to dynamically test the code?

ACondition testing
BMultiple condition testing
CEquivalence partitioning
DCause/effect graphing
ECode reviews
Question #17Part 1Test Automation

How many test cases are required to test code-fragment lines 26–32 and attain 100% condition determination coverage?

A2
B3
C4
D5
Question #18Part 1Testing in Agile

The use of multiple condition testing is also under consideration. Which specification-based technique is primarily founded on the principle of multiple condition testing?

AEquivalence Partitioning
BState Transition Testing
CDecision Table Testing
DUse Cases
Question #19Part 1Requirements Engineering

A product risk analysis of components I, II, and III in the airplane control system produced the following risk matrix: ![Question Image](https://cdn.examcademy.com/images/questions/1784764284967-o9mv1tfc.png) The project intends to mitigate these risks by defining different coverage types according to the components’ risk levels. Which of the following is a meaningful approach to setting the coverage targets?

AI: Condition determination coverage, II: Decision Coverage, III: Statement coverage
BI: Condition determination coverage, II: Statement coverage, III: Decision coverage
CI: Decision coverage, II: Condition determination coverage, III: Statement Coverage
DI: Multiple condition coverage, II: Decision coverage, III: Condition determination coverage
Question #20Part 1Testing in Agile

How many test cases are required to test code-fragment lines 26–32 and attain 100% multiple-condition coverage?

A2
B3
C4
D8
Question #21Part 1Testing in Agile

Management considers the Bonus Program to be critical. Defects in the program would lead to financial loss almost immediately. Previously, an improvement program was conducted to implement reviews based on IEEE 1028. Knowledge and skills in both formal and informal reviews are available, as is an existing pool of review leaders. Which of the following review types would you select to review the program?

AInformal review
BInspection
CWalkthrough
DManagement review
Question #22Part 1Testing in Agile

You have tested the program and found that a boundary value for **“bonus”** has not been implemented according to the design. You have written an incident report. Which of the following is the highest-quality incident report?

ADescription: Boundary value not correctly implemented Priority: High Repeatability: Yes Tester: WVU Test case: 35 (test specification "bonus program"), V1.2
BDescription: Boundary value not correctly implemented for bonus Priority: Medium Tester: WVU Test case: 35 (test specification "bonus program")
CDescription: Boundary value not correctly implemented for bonus (line 26: 10 according to design, now 5 implemented) Priority: High Repeatability: Yes Tester: WVU Test case: 35 (test specification "bonus program"), V1.2
DDescription: Boundary value not correctly implemented for bonus Priority: High Repeatability: Yes Tester: WVU
Question #23Part 1Testing in Agile

During code reviews, which of the following types of defects is the hardest to detect?

ADead code
BVariable used that is not defined
CMemory issues
DConformance to design
Question #24Part 1Testing in Agile

During code reviews, the author is responsible for…

Ato address all major and minor defects as stated in the defect log
Bto fix all major and minor defects as stated in the defect log
Cto take action on only improvement suggestions from the defect log
Dto correct source documents that have major defects
Question #25Part 1Testing in Agile

An organisation has already implemented a static-analysis tool and is considering whether code reviews would provide added value. Which of the following defect types can be found only through code reviews?

AConformance to coding standards
BConformance to design
CEndless loop
DCyclomatic complexity too high
Question #26Part 1Testing in Agile

To support code reviews, a checklist will be created. WhichTWOquestions from the list should be included in the code review checklist?

AAre any magic numbers (numeric literals) used, other than 0 or 1?
BCan each item be implemented with the techniques, tools, and resources available?
CIs it possible during acceptance testing to verify whether the item has been satisfied?
DIs the item specified in an exact, unambiguous way?
EIs there any logic containing no statements and no explanation as to why it is empty?
Question #27Part 1Testing in Agile

The use of exploratory testing (ET) during unit testing is under consideration. Which ET deliverable is the main candidate for informal reviews?

ATest log & coverage outline
BTest charter
CHeuristics
DTest case specification
Question #28Part 1Testing in Agile

Which of the following is the key benefit of including exploratory testing in the test approach for the "Bonus Program"?

AThe ability to utilize a very experienced test team
BThe ability to accurately predict the residual risk prior to delivery
CThe ability to prevent defects during requirements analysis
DThe ability to test effectively without a complete test basis
Question #29Part 1Test Automation

Which are theTWOmost significant benefits that a test execution tool should provide to the organisation?

ALess expensive and time consuming regression testing
BMore structured incident management
CImproved control and monitoring
DVisibility on test coverage
EMore coverage during regression testing
Question #30Part 1Testing in Agile

WhichTWOpitfalls are the most significant for the organisation to recognize?

ALack of good process as a baseline
BCost of maintenance of test scripts
CTest management will become more time-consuming
DNeed to train testers and gain skills
ECoverage measurements are often difficult
Question #31Part 1Deployment and Delivery

SelectTWOsolutions that would enable the team to achieve significant benefits from using this tool within the next 6 months.

AIntroduce data-driven or keyword driven scripting techniques
BChange the development process
CSelect and implement a test management tool to complement the test suite
DIdentify critical parts of the system and concentrate on automating some of those tests for that particular area
EGet business testers involved in the automation process
Question #32Part 1Testing in Agile

A developer has spent three days investigating a system that crashes intermittently. The issue was caused by two coding faults: - A variable was used but had not been defined. - There was agotostatement to an undefined label.

AStatic analysis tool
BCode coverage tool
CDynamic analysis tool
DTest execution tool

📢 Unlock Full Access to Success!

"The content displayed here is a promotional preview and contains only 50% of the actual exam database. To access the complete set of updated questions, please upgrade to the Full Version."

👉 Click the button and follow the instructions to secure your full access immediately!