Welcome to awslagi.com – Sharing AWS, Google Cloud, Microsoft Azure IT Exams. It's free for all!

HQT-4180: Hitachi Vantara Qualified Professional - VSP Midrange Family Installation

Master the Hitachi Vantara Hitachi Vantara Qualified Professional - VSP Midrange Family Installation (HQT-4180) certification exam with 54 realistic practice questions covering Remote Ops monitoring, System maintenance, Firmware upgrades, Configuration changes.

4.8★★★★★(219 ratings)
19,223 studentsAdvanced
Prepare for the Hitachi Vantara Hitachi Vantara Qualified Professional - VSP Midrange Family Installation (HQT-4180) certification with scenario-based practice questions modeled on real exam objectives. You will build practical confidence across key domains including Remote Ops monitoring, System maintenance, Firmware upgrades, Configuration changes. Each question includes structured answer options and hint answers to help you identify knowledge gaps quickly, reinforce core Hitachi Vantara concepts, and pass the HQT-4180 exam on your first attempt.

What you'll learn

  • Remote Ops monitoring
  • System maintenance
  • Firmware upgrades
  • Configuration changes
  • System installation
  • Storage management tools

HQT-4180

Lectures1
Questions54
Duration30 week
Students19,223

$20.00

Full Free Question Bank (54 Questions)

HQT-4180: Hitachi Vantara Qualified Professional - VSP Midrange Family Installation (HQT-4180) Practice Questions & Verified Answers

Click any option to test your knowledge, or reveal the verified answer and detailed explanation below each question.

Question #1Part 1Remote Ops monitoring

Which two tasks can be performed using Hitachi Ops Center Administrator?

APerform Self-Service Maintenance.
BManage virtual storage machines.
CManage multiple VSP Midrange storage systems.
DConfigure the Hitachi Remote Ops Monitor Agent.
Question #2Part 1System maintenance

You must replace a failed power supply (PS) in a VSP E590. What is the proper procedure?

ACheck if the status of the PS is blocked, and if yes, then replace it directly.
BUse the Maintenance Utility for blocking the PS, then replace it.
CUse the Maintenance Utility for blocking the controller, then replace the PS.
DUse the MPC for blocking the PS, then replace it.
Question #3Part 1Firmware upgrades

What should you do first when upgrading the SVP software on a VSP G350 system?

ALog into the SVP and stop the SVP services.
BRun the “setup.exe” program as an administrator user.
CLog into Storage Navigator and select “SVP upgrade”.
DLog into the Maintenance Utility and select “SVP upgrade”.
Question #4Part 1Configuration changes

Which tool is required to configure System Option Modes (SOMs)?

AHSAe
BMPC software
CHitachi Ops Center
DWebconsole
Question #5Part 1System maintenance

From which two locations may the Maintenance Utility be launched on a VSP One B26?

AVSP One Block Administrator
BHitachi Remote Ops Monitor Agent
CSVP Web Console
DMPC connected to the Maintenance LAN port on the array
Question #6Part 1System maintenance

You need to replace a failed disk drive on a VSP G700. What two prerequisites are required?

AYou must use the Replace button in the Maintenance Utility before removing the drive.
BYou must wear a wrist strap for ESD protection.
CThe red LED on the drive must be lit.
DThe Drive Box where the drive is located must be powered down.
Question #7Part 1System installation

You are installing a VSP F370 and need to connect your laptop to one of the controllers. What are the two default IP addresses for the maintenance ports of CTL1 and CTL2?

A10.0.0.17
B10.0.0.16
C192.168.0.17
D192.168.0.16
Question #8Part 1Configuration changes

Which three System Option Mode (SOM) types can be used on VSP Midrange systems?

AP – Public Mode
BS – Support Mode
CT – Technical Support Mode
DH – Hitachi Mode
ER – RSD Mode
Question #9Part 1Remote Ops monitoringSelect 2

Which two methods can be used to obtain detailed information about failed parts in a VSP Midrange system? (Choose two.)

Afrom the Maintenance Utility Interface
Bfrom the Notification History window in VSP One Block Administrator
Cfrom the audit log in HSAE
Dfrom the MPC message logs in the Information menu
Question #10Part 1Storage management tools

A drive in a VSP One B24 system is configured in a Dynamic Drive Protection (DDP) group. If this drive becomes blocked because of a failure, which process automatically begins to keep the DDP redundant?

ACorrection Copy with spare drive
BCorrection Copy with spare areas on drives
CDynamic Sparing with spare areas on drives
DDynamic Sparing with spare drive
Question #11Part 1Configuration changes

Which tool is used to modify System Option Modes (SOMs)?

AHitachi Ops Center
BWebconsole
CHSAe
DMPC software
Question #12Part 1Remote Ops monitoring

What tool monitors a VSP E590 system and reports System Information Messages (SIMs)?

AHitachi Remote Ops Monitor Agent
BHitachi Remote Ops SVP Agent
CHitachi Ops Center Protector
DStorage Navigator
Question #13Part 1System installation

A VSP E1090 customer wants to add an additional rack with Drive Boxes, but the new rack cannot be installed side-by-side with the controller rack. You plan to order SAS optical cables to connect the two racks. Which three cable lengths are available (in meters)?

A5m
B10m
C30m
D50m
E100m
Question #14Part 1System maintenance

A failing power supply (PS) in a VSP One B26 must be replaced. What is the proper procedure?

AUse the Maintenance Utility for blocking the controller, then replace the PS.
BUse the MPC for blocking the PS, then replace it.
CUse the Maintenance Utility for blocking the PS, then replace it.
DCheck if the status of the PS is blocked, and if yes, then replace it directly.
Question #15Part 1System architecture & components

A VSP E1090 storage array is installed with four Disk Boards (DKBs). How many Channel Boards (CHBs) can be installed in this system?

A8
B10
C12
D16
Question #16Part 1Firmware upgrades

You need to update the firmware on a VSP E1090. When using the Maintenance Utility, which file must you choose to carry out the upgrade?

AHA-SVP-xx.iso
Bsetup.exe
CHA-MPC-xx.iso
DAll Firmware.mda
Question #17Part 1System architecture & components

How many Disk Boards (DKBs) are present in a VSP E1090 system with at least one Drive Box (DB) connected?

A1
B2
C4
D8
Question #18Part 1Remote Ops monitoring

Where is the Hitachi Remote Ops Monitor Agent installed to monitor a VSP Midrange system?

Aon the MPC
Bon both controllers
Con a standalone server
Don the SVP
Question #19Part 1System maintenance

Which two Maintenance Utility indicators show that a hardware component has failed?

Aa flag in the SIM log history
Bamber frames around pictures
Ca red star in the Tasks list
Dexclamation marks in lists
Question #20Part 1System architecture & components

Which tool determines the back-end cabling configuration for a VSP Midrange system?

ACABLE connection Tool
BBECK Tool
CHSA configuration Tool
DSVP Offline Tool
Question #21Part 1System architecture & components

What is the maximum number of drives in a VSP E1090 system?

A552
B960
C1056
D1440
Question #22Part 1Remote Ops monitoring

You have just installed and configured two new VSP One B26 systems. The customer uses the Hitachi Ops Center suite to manage all of their VSP systems. Which software tool should they use to register the new B26 systems so they can begin administering them?

AHitachi Storage Advisor Embedded
BHitachi VSP One Block Administrator
CWebconsole
DHitachi Ops Center Administrator
Question #23Part 1Storage management tools

Which RAID level is recommended when you create a Hitachi Dynamic Provisioning (HDP) pool on a VSP E1090?

ARAID 1
BRAID 1+0
CRAID 5
DRAID 6
Question #24Part 1Remote Ops monitoring

Which three VSP systems are monitorable by the Hitachi Remote Ops Monitor Agent?

AVSP E1090
BVSP F800
CVSP G350
DVSP N600
EVSP One B26
Question #25Part 1System architecture & components

Within the VSP Midrange family, which module supplies power to the Cache Flash Memory (CFM) and the cache during a power outage?

APower Supply Module
BPower Module
CBackup Module
DCache Module
Question #26Part 1System installation

Which IP address must be configured on the Maintenance PC (MPC) so that you can perform a “New Installation” of a VSP Midrange system?

A10.0.0.15
B10.1.1.100
C126.255.255.13
D192.168.0.15
Question #27Part 1Remote Ops monitoringSelect 2

Which two actions can be performed by using the Management LAN port on a VSP One B26? (Choose two.)

AConnect the MPC to perform a new installation.
BLaunch VSP One Block Administrator.
CConnect the VSP to a Hitachi Ops Center server.
DLaunch HSAE via a Web browser.
Question #28Part 1Storage management tools

Several drives were added to a VSP E1090, but the process failed. What should you do first?

AUse the DKU Inline Test from the MPC
BIsolate the failed drives and move them to empty slots to test them
CPerform a dummy replacement of the DKB
DRefer to the VSP Maintenance Manual troubleshooting section
Question #29Part 1Configuration changes

Which tool is used to install license keys on a VSP G370 system?

AHSA Embedded
BMPC Software
CStorage Navigator
DMaintenance Utility
Question #30Part 1System architecture & components

For a VSP E790, how many DIMMs are contained in each Cache Memory Group (CMG) per controller?

A2
B4
C6
D8
Question #31Part 1Back-end architecture

What is the numbering order of the first four Drive Boxes (DBs) connected to the back end of a VSP G700?

ADB0, DB1, DB2, DB3
BDB1, DB2, DB3, DB4
CDB0, DB1, DB24, DB25
DDB1, DB2, DB25, DB26
Question #32Part 1Firmware upgradesSelect 2

You need to perform a non-disruptive cache upgrade on a VSP One B28. In this scenario, which two statements are correct? (Choose two.)

AAll the ports will be kept online during the whole process.
BYou need to block the controllers one at a time to add the DIMMs.
CYou need to define spare disks before starting the upgrade.
DPorts will be blocked controller by controller during the process.
Question #33Part 1Configuration changes

A customer wants to change a production RAID Group on a VSP G700 from RAID 5 (7D+1P) to RAID 6 (6D + 2P) during normal operations. They have just unmapped the LUNs from the channel ports. What must be performed next?

AThe RAID level must be changed in Storage Navigator.
BThe RAID level must be changed in the SVP Maintenance window.
CThe RAID 5 Group must be put into DRU mode in Storage Navigator.
DThe RAID Group must be deleted.
Question #34Part 1Firmware upgrades

You need to carry out a firmware update on a VSP One B28. The DKCMain, CHBs, and drive microcode will be updated. What are two requirements?

AThese should be no sparing processes running in the background.
BThe Cache Write Pending rate should be below 30%.
CThe microprocessors utilization should be below 50%.
DThe CHBs must be updated first.
Question #35Part 1Configuration changes

A customer plans to upgrade a VSP G700 to a 512 GB RAM capacity. What is the valid CFM configuration?

Atwo BM35 per controller
Btwo BM45 per controller
Cone BM45 per controller
Dtwo BM35 per system
Question #36Part 1System architecture & components

Which three Channel Board types are supported by VSP One B20 systems?

AFC
BFICON
CiSCSI
DNVMe TCP
ESAS
Question #37Part 1Configuration changesSelect 2

A customer has a VSP G370 with the encryption license key installed. They now want all DP-Volumes in a particular pool to reside on encrypted RAID Groups. What are two requirements? (Choose two.)

AThe controller board must support encryption.
BThe RAID level of RAID Groups in the pool must be RAID 6.
CAt least 20 GB of Shared Memory must be installed.
DThe RAID Groups in the pool must be formatted with encryption enabled.
Question #38Part 1System architecture & components

Which two functions does the LAN Blade perform in the VSP Midrange family?

AIt provides the LAN connection to the file module.
BIt provides the maintenance port connecting to the MPC.
CIt provides the iSCSI connection to the servers.
DIt provides the management port connecting to the customer LAN.
Question #39Part 1System installation

You must carry out theNew Installationprocedure for a VSP One B26 system. Which two prerequisites are required?

AThe MPC software must be configured on your CE laptop
BThe controller hardware must be cabled and assembled
CThe SVP must be connected to the customer network
DThe CE hardware jumpers must be attached to both controllers
Question #40Part 1System maintenance

Which manual should be used to perform maintenance actions on VSP midrange storage systems?

AAdministrator Guide
BProduct Documentation Library
CMaintenance Manual
DService Guide
Question #41Part 1System maintenanceSelect 2

The SVP in a VSP G900 system has failed, and you have been asked to replace it. Which two items must be available to carry out the replacement? (Choose two.)

Athe iso file with the correct version of Hitachi Ops Center
Bthe iso file with the correct version of the Windows operating system
Cthe microcode iso file with the correct software versions
Dthe Hitachi Remote Ops Monitor Agent iso file
Question #42Part 1Configuration changesSelect 3

A storage administrator needs to present an LDEV to a server connected to a newly installed VSP One B28 system. Two Host Groups have been created on ports CL3-A and CL4-A for this server. Which three items must be registered in these Host Groups? (Choose three.)

ALUN
BWWPN
CServer Name
DHost Mode
ERAID Group
Question #43Part 1Storage management tools

Which two mechanisms maintain redundancy following a disk failure on a VSP Midrange system?

AQuick Copy
BDynamic Sparing
CEmergency Destage
DCorrection Copy
Question #44Part 1System maintenanceSelect 2

In a VSP G700, a drive in a 3D + 1P RAID group fails, and no spare drive is available. Which two actions does the system perform automatically? (Choose two.)

AAn alert is generated.
BDynamic Sparing is started.
CThe Correction Copy process starts.
DThe RAID group is placed in Correction Access.
Question #45Part 1System architecture & components

Which two VSP systems support an attached Drive Box Flash (DBF)?

AVSP E590
BVSP F370
CVSP F700
DVSP G900
Question #46Part 1System installation

You need to perform a “New Installation” of a VSP E790 system. Which three requirements apply to your maintenance laptop?

AYou must have a 32GB USB memory stick available
BInternet Information Service (IIS) must be configured
CThe MPC software must be installed
DFirewall rules must be enabled
EAn antivirus software must be installed
Question #47Part 1System maintenance

You must replace a failed disk drive on a VSP One B26. Which two prerequisites are required?

AYou must wear a wrist strap for ESD protection.
BYou must use the Replace button in the Maintenance Utility before removing the drive.
CThe red LED on the drive must be lit.
DThe Drive Box where the drive is located must be powered down.
Question #48Part 1System maintenance

The amber warning LED on a VSP One B26 system is illuminated. What could be a possible cause?

Aaudit log full
Bsystem in Modify Mode
Cpart failure
Dmaintenance access
Question #49Part 1System maintenance

What occurs when you enter the IP address of a VSP One B26 Maintenance Port in a browser window?

AIt starts HSA Embedded.
BIt invokes Storage Navigator.
CIt asks for the Maintenance Utility login.
DIt displays the GUM options menu.
Question #50Part 1System maintenance

A fan in a VSP E1090 has failed and must be replaced. What is the proper procedure?

AUse the MPC for blocking the fan, then replace it.
BUse the Maintenance Utility for stopping the fan, then replace it.
CRemove the broken fan, then replace it.
DUse Storage Navigator for blocking the fan, then replace it.
Question #51Part 1System installation

Which two consequences occur when a “New Installation” procedure is carried out on a VSP Midrange system?

AThe hardware configuration must be regenerated manually.
BThe license keys get deleted.
CThe SVP drive is formatted.
DAll the data on RAID groups is lost.
Question #52Part 1System installation

You are planning the installation of three VSP E1090 systems. Which tool should you use to create back-end cabling diagrams?

AStorage Navigator
BMaintenance Utility
COffline SVP Tool
DBeck Tool
Question #53Part 1Back-end architecture

Which two back-end SAS cable connections are valid on a VSP midrange system?

Afrom DKA to DKB
Bfrom ENC to ENC
Cfrom DKB to ENC
Dfrom DKA to SSW
Question #54Part 1Configuration changes

In a VSP E1090, the CMG0 in each controller contains four 32GB DIMMs. How can the cache capacity be increased non-disruptively?

Aby installing a CMG1 with four 32GB DIMMs per controller
Bby installing a CMG1 with four 64GB DIMMs per controller
Cby installing at least one additional 32GB DIMM per controller
Dby running a type change from 32GB to 64GB DIMMs

📢 Unlock Full Access to Success!

"The content displayed here is a promotional preview and contains only 50% of the actual exam database. To access the complete set of updated questions, please upgrade to the Full Version."

👉 Click the button and follow the instructions to secure your full access immediately!