Professional Scrum Master I
Practice questions for the Professional Scrum Master I certification exam.
4.6★★★★★(284 ratings)
18,566 studentsAdvanced- •Familiarity with basic IT concepts
- •Access to relevant platform tools for hands-on practice
- •Interest in pursuing PSM-I certification
- •Engineers and architects pursuing professional certification
- •Developers looking to validate their skills
- •IT professionals transitioning to specialized roles
- •Students preparing for certification exams
This course covers everything you need to pass the Professional Scrum Master I (PSM-I) exam. Each part of this course contains real exam questions taken from the actual exam pool, with hint answers to guide your study. Practice with these questions to build confidence and master the topics needed for certification success.
What you'll learn
- Master the core concepts for PSM-I certification
- Practice with real exam-style questions
- Understand platform services and architectures covered in PSM-I
- Build confidence through timed practice exams
- Learn from detailed hint answers and explanations
- Pass the official PSM-I certification exam on your first try
PSM-I
Lectures2
Questions88
Duration30 week
Students18,566
$20.00
Full Free Question Bank (88 Questions)
Professional Scrum Master I (PSM-I) Practice Questions & Verified Answers
Click any option to test your knowledge, or reveal the verified answer and detailed explanation below each question.
Jump to Section:
Question #1Part 1
AYes, but only for Scrum Teams whose work has dependencies.
BYes, otherwise the Product Owners (and stakeholders) may not be able to accurately inspect
CNo, each Scrum Team stands alone.
DNo, that is far too hard and must be done in a hardening Sprint.
✓ Verified Answer: B
Question #2Part 1
When can a Development Team cancel a Sprint?
AIt can't. Only Product Owners can cancel Sprints.
BWhen functional expectations are not well understood.
CWhen the Product Owner is absent too often.
DWhen the selected Product Backlog items for the Sprint become unachievable.
EWhen a technical dependency cannot be resolved.
✓ Verified Answer: A
Question #3Part 1
Which output from Sprint Planning provides the Development Team with a target and overarching direction for the Sprint?
AThe Sprint Backlog.
BThe Sprint Goal
CThe release plan.
DSprint Review minutes.
✓ Verified Answer: B
Question #4Part 1
How should a Development Team deal with non-functional requirements?
AEnsure every Increment meets them.
BMake sure the release department understands these requirements, but it is not the
CHandle them during the Integration Sprint preceding the Release Sprint.
DAssign them to the lead developers on the team.
✓ Verified Answer: A
Question #5Part 1
When is a Sprint over?
AWhen the Product Owner says it is done.
BWhen all Product Backlog items meet their definition of ג €Done ג €.
CWhen all the tasks are completed.
DWhen the time-box expires.
✓ Verified Answer: D
Question #6Part 1
True or False: Scrum has a role called Project Manager.
ATrue
BFalse
✓ Verified Answer: B
Question #7Part 1Select 2
What are two effective ways for the Scrum Team to make non-functional requirements visible? (Choose two.)
APut them on a separate list on the Scrum board, available for all to see.
BAdd them to the Product Backlog to ensure transparency.
CRun the integration and regression tests before the end of the Sprint, and capture the open
DAdd them to the definition of ג €Done ג € so the work is taken care of every Sprint.
✓ Verified Answer: BD
Question #8Part 1
How much time is required after a Sprint to prepare for the next Sprint?
AThe break between Sprints is time-boxed to 1 week for 30 day Sprints, and usually less for
BEnough time for the requirements for the next Sprint to be determined and documented.
CEnough time for the Development team to finish the testing from the last Sprint.
DNone. A new Sprint starts immediately following the end of the previous Sprint.
EAll of the above are allowed depending on the situation.
✓ Verified Answer: D
Question #9Part 1
During Sprint Planning the Product Owner and the Developers are unable to reach an understanding about the highest order Product Backlog items. Because of this, the Developers are unable to determine how many Product Backlog items they can forecast for the upcoming Sprint. However, the Product Owner and the Developers are able to agree on a Sprint Goal. Which of the following actions should the Scrum Master support? (Choose two.)
ACancel the Sprint. Send the entire team to an advanced Scrum training and then start a new
BForecast the Product Backlog items that are most likely to meet the Sprint Goal and create
CContinue the Sprint Planning event past its timebox until an adequate number of Product
DDuring the next Sprint Retrospective discuss why this happened and what changes will make
EAsk everyone to take as much time as needed to analyze the Product Backlog first, and then
✓ Verified Answer: D
Question #10Part 1
Who can cancel a Sprint?
AThe Scrum Team.
BThe Scrum Master.
CThe Product Owner.
DThe Stakeholders.
✓ Verified Answer: A
Question #11Part 1
Which of the following is required by Scrum?
ASprint Retrospective.
BMembers must be stand up at the Daily Scrum.
CSprint Burndown Chart.
DRelease planning.
EAll of the above.
✓ Verified Answer: A
Question #12Part 1
What is the purpose of a Sprint Review?
ATo take time to judge the validity of the project.
BTo inspect the product Increment with the stakeholders and collect feedback on next steps.
CTo review the Scrum Team's activities and processes during the Sprint.
DTo build team sprint.
✓ Verified Answer: B
Question #13Part 1
Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
AThe Project Manager.
BThe Development Team.
CThe Scrum Team.
DThe Product Owner.
✓ Verified Answer: B
Question #14Part 1
Who must attend the Daily Scrum?
AThe Scrum Master and Product Owner.
BThe Development Team.
CThe Development Team and Product Owner.
DThe Scrum Team.
EThe Development Team and Scrum Master.
✓ Verified Answer: B
Question #15Part 1
When do Development Team members take ownership of a Sprint Backlog item? (Choose the best answer.)
AAt the Sprint planning meeting.
BDuring the Daily Scrum.
CNever. All Sprint Backlog Items are ג €owned ג € by the entire Scrum Team.
DWhenever a team member can accommodate more work.
✓ Verified Answer: C
Question #16Part 1
True or False: The purpose of a Sprint is to produce a valuable, useful Increment.
ATrue
BFalse
✓ Verified Answer: A
Question #17Part 1
Who creates the definition of Done?
AThe Scrum Master as he/she is responsible for the Development Team's productivity.
BThe Scrum Team, in a collaborative effort where the result is the common denominator of all
CThe Product Owner as he/she is responsible for the product's success.
DThe development organization (or Development Team if none is available from the
✓ Verified Answer: B
Question #18Part 1
Five new Scrum Teams have been created to build one product. A few of the developers on one of the Scrum Teams ask the Scrum Master how to coordinate their work with the order teams. What should the Scrum Master do?
ATeach the Product Owner to work with the lead developers on ordering Product Backlog in a
BTeach them that it is their responsibility to work with the other teams to create an integrated
CCollect the Sprint tasks from the teams at the end of their Sprint Planning and merge that into
DVisit the five teams each day to inspect that their Sprint Backlogs are aligned.
✓ Verified Answer: B
Question #19Part 1Select 2
Which two things should the Development Team do during the first Sprint? (Choose two.)
AMake up a plan for the rest of the project.
BAnalyze, describe, and document the requirements for the subsequent Sprints.
CDevelop at least one piece of functionality.
DAnalyze, design, and describe the complete architecture and infrastructure.
ECreate an increment of potentially releasable software.
✓ Verified Answer: CE
Question #20Part 1
What are three ways Scrum promotes self-organization? (Choose three.)
ABy not allowing documentation.
BBy the Development Team deciding what work to do in a Sprint.
CBy preventing stakeholders from entering the development room.
DBy removing titles for Development Team members.
EBy being a lightweight framework.
✓ Verified Answer: B
Question #21Part 1
What is the key concern when multiple Development Teams are working from the same Product Backlog?
AMinimizing dependencies between teams.
BClear definition of requirements.
CMeeting original scope projections.
DMaking sure there's enough work for everyone on every team.
EMaximizing velocity.
✓ Verified Answer: B
Question #22Part 1
What does it mean to say that an event has a time-box?
AThe event must happen at a set time.
BThe event must happen by a given time.
CThe event must take at least a minimum amount of time.
DThe event can take no more than a maximum amount of time.
✓ Verified Answer: D
Question #23Part 1
Which outcome is expected as Scrum Teams mature?
AThey will improve their definition of ג €Done ג € to include more stringent criteria.
BThe Sprint Retrospectives will grow to be longer than 4 hours.
CThere is no need for a time-boxed Sprint.
DSprint Reviews will no longer be needed.
EA Scrum Master is no longer needed since they are a mature team now.
✓ Verified Answer: A
Question #24Part 1
When must a Scrum Team release each Increment?
AWhen it makes sense to release it.
BWhen the Scrum Team finishes their work.
CWhenever the product is free of defects.
DAfter every Sprint, without exception.
✓ Verified Answer: A
Question #25Part 1
A properly functioning Scrum Team will have at least one Release Sprint and may well have several.
ATrue
BFalse
✓ Verified Answer: B
Question #26Part 1
Scrum is a methodology that tells in detail how to build software incrementally.
ATrue
BFalse
✓ Verified Answer: B
Question #27Part 1
For which is the Scrum Master responsible?
AManaging the performance of the Scrum Team.
BThe meetings and the objectives that a Scrum Team sets for itself.
CThe Scrum framework being adopted and used properly.
DKeeping track of resource allocation.
✓ Verified Answer: C
Question #28Part 1
The Developers ask their Product Owner to re-order the Product Backlog. The team is waiting for an external supplier to deliver a component. Without that component there will not be enough work in the next Sprint to occupy the full team. As the Scrum Master, what advice would you give the Product Owner?
ARemind the Product Owner that his primary concern is the flow of value reflected in the
BTell the Product Owner to re-order the Product Backlog so the work involving the external
CTell the Product Owner that the Product Backlog should be ordered to maximize utilization of
✓ Verified Answer: A
Question #29Part 1Select 2
As the Sprint Planning meeting progresses, the Development Team sees that the workload is greater than they can handle. Which two are valid actions? (Choose two.)
ARecruit additional Development Team members before the work can begin.
BThe Development Team ensures that the Product Owner is aware, starts the Sprint, and
CCancel the Sprint.
DRemove or change selected Product Backlog items.
EThe Development Team works overtime during this Sprint.
✓ Verified Answer: BD
Question #30Part 1Select 3
Currently, your Development Teams are organized to address a single layer only (for example, front end, middle tier, back end, and interfaces). What are three things to consider when deciding to move away from such component teams toward feature teams? (Choose three.)
AYou cannot do Scrum without feature teams.
BProductivity may suffer when making this kind of move.
CGetting support from the business side first helps.
DFeature teams have less communication overhead.
EWith feature teams, it is easier to calculate the productivity per team.
✓ Verified Answer: BDE
Question #31Part 1
During a Sprint, when is new work or further decomposition of work added to the Sprint Backlog?
AWhen the Product Owner identifies new work.
BAs soon as possible after they are identified.
CWhen the Scrum Master has time to enter them.
DDuring the Daily Scrum after the Development Team approves them.
✓ Verified Answer: D
Question #32Part 1
What is the main reason for the Scrum Master to be at the Daily Scrum?
ATo gather status and progress information to report to management.
BTo write down any changes to the Sprint Backlog, including adding new items, and tracking
CThey do not have to be there; they only need to ensure the Development Team has a Daily
DTo make sure every team member answers the three questions.
✓ Verified Answer: C
Question #33Part 1
You have six teams using a traditional method to deliver a product. Your management has asked you to start using Scrum. In the initial project there were separate plans and teams for the layers of a software system, i.e. one for the front-end, one for the middle tier, one for the back-end, and one for the interfaces and services. This resembles what is known as component teams. But you have read that it's a good idea to have teams organized by feature. What are the advantages of keeping component teams while starting Scrum?
AThere's less initial disruption than organizing into new teams. As they start, they will discover
BComponent teams generally have the skills needed to create a working Increment of software
CBecause they have worked together for some time, they are likely able to start producing
DThere are fewer cross-team dependencies than working in feature teams.
✓ Verified Answer: A
Question #34Part 1
How should Product Backlog items be chosen when multiple Scrum Teams work from the same Product Backlog?
AThe Scrum Team with the highest velocity pulls Product Backlog items first.
BThe Development Teams pull in work in agreement with the Product Owner.
CThe Product Owner should provide each team with its own Product Backlog.
DEach Scrum Team takes an equal numbers of items.
EThe Product Owner decides.
✓ Verified Answer: B
Question #35Part 1
How often should Scrum Team membership change?
AAs needed, while taking into account a short term reduction in productivity.
BNever, because it reduces productivity.
CAs needed, with no special allowance for changes in productivity.
DEvery Sprint to promote shared learning.
✓ Verified Answer: A
Question #36Part 1
Who should make sure everyone on the Scrum Team does his or her tasks for the Sprint?
AThe Project Manager.
BThe Product Owner.
CThe Scrum Master.
DThe Scrum Team.
EAll of the above.
✓ Verified Answer: D
Question #37Part 1
When is it most appropriate for a Development Team to change the definition of Done?
ADuring Spring Planning.
BPrior to starting a new Sprint.
CDuring the Sprint Retrospective.
DPrior to starting a new project.
✓ Verified Answer: C
Question #38Part 1Select 3
The Daily Scrum is an event that happens every day. What would be three key concerns if the frequency were to be lowered to every two or three days? (Choose three.)
AOpportunities to inspect and adapt the Sprint Backlog are lost.
BImpediments are raised and resolved more slowly.
CThe Product Owner cannot accurately report progress to the stakeholders.
DToo much work is spent updating the Scrum board before the meeting.
EThe Scrum Master loses the ability to update the Gantt chart properly.
✓ Verified Answer: ABF
Question #39Part 1
Which statement best describes Scrum?
AA defined and predictive process that conforms to the principles of Scientific Management.
BA complete methodology that defines how to develop software.
CA cookbook that defines best practices for software development.
DA framework within which complex products in complex environments are developed.
✓ Verified Answer: D
Question #40Part 1Select 3
Which Scrum Values are exhibited by not building Product Backlog items that have low business value? (Choose three.)
AEconomic Value Added.
BRespect.
CFocus.
DEarned Value.
ECourage.
✓ Verified Answer: BCE
Question #41Part 1
Who creates a Product Backlog Item's estimate?
AThe Development Team after clarifying requirements with the Product Owner.
BThe Product Owner with input from the Development Team.
CThe most senior people in the organization, including architects and subject matter experts.
DThe Scrum Master.
EThe Development Team, alone.
✓ Verified Answer: A
Question #42Part 1
Who starts the Daily Scrum?
AThe person coming in last. This encourages people to be on time and helps to stay within the
BWhoever the Development Team decides should start.
CThe person who has the token.
DThe Scrum Master. This ensures that the Development Team has the meeting and stays
EThe person who last broke the build.
✓ Verified Answer: B
Question #43Part 1Select 3
You are the Scrum Master on a newly formed Scrum Team. Which three of the following activities would probably help the team in starting up? (Choose three.)
AIntroduce a bonus system for the top performers in the team.
BHave the Scrum Team members introduce themselves to each other and give a brief
CHave the development managers for each Development Team member introduce their direct
DEnsure the Scrum Team members have compatible personalities.
EEnsure the team understands they need a definition of ג €Done ג €.
✓ Verified Answer: BEF
Question #44Part 1Select 3
A Development Team selects a set of Product Backlog items for a Sprint Backlog with the intent
to get the selected items Done by the end of the Sprint. Which three phrases best describe the
purpose of a definition of Done? (Choose three.)
AIt controls whether the developers have performed their tasks.
BIt provides a template for elements that need to be included in the technical documentation.
CIt creates transparency over the work inspected at the Sprint Review.
DIt trucks the percent completeness of a Product Backlog item.
EIt guides the Development Team is creating a forecast at the Sprint Planning.
✓ Verified Answer: CEF
Question #45Part 1Select 2
Select two ways in which technical debt impacts transparency. (Choose two.)
AWhen calculated and estimated, the total amount of technical debt shows exactly how long
BIt leads to false assumptions about the current state of the system, specifically of an
CAs development progresses and code is added, the system becomes more difficult to
DIt enhances transparency for the Product Owner as a Development Team is not allowed to do
✓ Verified Answer: BC
Question #46Part 1
Which of these may a Development Team deliver at the end of a Sprint?
AFailing unit tests, to identify acceptance tests for the next Sprint.
BAn increment of software with minor known bugs in it.
CAn increment of working software that is ג €done ג €.
DA single document, if that is what the Scrum Master asked for.
✓ Verified Answer: C
Question #47Part 1
How much of the Sprint Backlog must be defined during the Sprint Planning event?
AJust enough tasks for the Scrum Master to be confident in the Development Team's
BThe entire Sprint Backlog must be identified and estimated by the end of the Sprint Planning
CEnough so the Development Team can create its best forecast of what is can do, and to start
DJust enough to understand design and architectural implications.
✓ Verified Answer: C
Question #48Part 1
Who is responsible for managing the progress of work during a Sprint?
AThe Scrum Master.
BThe Development Team.
CThe Product Owner.
DThe most junior member of the Team.
✓ Verified Answer: B
Question #49Part 1Select 2
A Development Team is required to deliver a done Increment by the end of a Sprint. Select two
statements that explain what Done means. (Choose two.)
AAll work the Development Team is willing to do.
BReady for integration.
CNo work left from the definition of ג €Done ג €.
DWhatever the Product Owner defines as quality.
EReady to be released to end users.
✓ Verified Answer: CE
Question #50Part 1
What two factors are best considered when establishing the Sprint length? (Choose two.)
AThe organization has mandated similar length sprints.
BThe level of uncertainty over the technology to be used.
CThe frequency at which team formation can be changed.
DThe risk of being disconnected from the stakeholders.
✓ Verified Answer: D
Question #51Part 1Select 2
Which of the following are true about the length of the Sprint? (Choose two.)
AThe length of the Sprint should be proportional to the work that is done in between Sprints.
BIt is best to have Sprints of consistent length throughout a development effort.
CSprint length is determined during Sprint Planning, and should hold the time it will take to
DSprint length is determined during Sprint Planning, and should be long enough to make sure
EAll Sprints must be 1 month or less.
✓ Verified Answer: BE
Question #52Part 1Select 2
What are two responsibilities of testers in a Scrum Team? (Choose two.)
AVerifying the work of programmers.
BEveryone in the Development Team is responsible for quality.
CTracking quality metrics.
DFinding bugs.
EScrum has no ג €tester ג € role.
✓ Verified Answer: BD
Question #53Part 1
The CEO asks the Development Team to add a very important item to a Sprint that is in
progress. What should the Development Team do?
AAdd the item to the current Sprint and drop an item of equal size.
BAdd the item to the current Sprint without any adjustments.
CInform the Product Owner so he/she can work with the CEO.
DAdd the item to the next Sprint.
✓ Verified Answer: C
Question #54Part 1
What is the role of management in Scrum? (Choose the best answer.)
ATo present the Scrum Teams with insights and resources that help them improve.
BTo monitor the Development Team's productivity.
CTo identify and remove people that aren't working hard enough.
DTo continually monitor staffing levels of the Scrum Team.
✓ Verified Answer: A
Question #55Part 1
Which technique is the best way the Scrum Master can ensure that the Development Team communicates effectively with the Product Owner?
AMonitor communications between them and facilitate direct collaboration.
BTeach the Development Team to talk in terms of business needs and objectives.
CTeach the Product Owner about the technologies employed during the Sprints.
DAct as a go-between for them.
✓ Verified Answer: A
Question #56Part 1
The time-box for a Daily Scrum is:
ATwo minutes per person.
B15 minutes.
CThe same time of day every day.
D4 hours.
✓ Verified Answer: B
Question #57Part 1
Which phrase best describes a Product Owner?
AGo-between development team and customers.
BValue optimizer.
CRequirements engineer.
DTeam manager.
✓ Verified Answer: B
Question #58Part 1
The length of a Sprint should be:
AShort enough to keep the business risk acceptable to the Product Owner.
BShort enough to be able to synchronize the development work with other business events.
CNo more than one calendar month.
DAll of these answers are correct.
✓ Verified Answer: D
Question #59Part 1
What is the Product Owner responsible for during the Sprint Retrospective? (Choose the best answer.)
AParticipating as a Scrum Team member.
BSummarizing and reporting the discussions to the stakeholders that they represent in the
CCapturing requirements for the Product Backlog.
DThe Product Owner should not take part in Sprint Retrospectives.
✓ Verified Answer: A
Question #60Part 1
Marian is the Product Owner envisioning a project for a new release of her product. She made a projection of a release date based upon a sustained velocity of 17 completed units of work per Sprint. Over the first 3 Sprints, the average velocity was 13 for work that the Development Team estimated as 90% done. The Development Teams, feeling the need to meet the plan, figured that a velocity of 17 was within their reach. A good way to continue is:
AThe Development Team makes sure that all of the selected scope per Sprint is as ג €Done ג €
BAdd enough people to the Development Team for the deadline to be made.
CThe opportunity to inspect and adapt is lost. Opaqueness has replaced transparency.
DThe Development Team should remind Marian to find funding for enough Release Sprints in
✓ Verified Answer: D
Question #61Part 2Select 2
The Product Owner is not collaborating with the Development Team during the Sprint. What are two valuable actions for a Scrum Master to take? (Choose two.)
AInform the Product Owner's functional manager.
BStop the Sprint, send the Product Owner to a course and restart.
CBring up the problem in the Sprint Retrospective.
DCoach the Product Owner in the values of Scrum and incremental delivery.
ENominate a proxy Product Owner.
✓ Verified Answer: CD
Question #62Part 2
For the purpose of transparency, when does Scrum say a valuable and useful increment must be available? (Choose the best answer.)
AAfter the Acceptance Testing phase.
BBefore the release Sprint.
CEvery 3 Sprints.
DAt the end of every Sprint.
EWhen the Product Owner asks to create one.
✓ Verified Answer: D
Question #63Part 2
Multiple Scrum Teams working on the same project must have the same Sprint start date.
ATrue
BFalse
✓ Verified Answer: B
Question #64Part 2Select 2
What is a Development Team responsible for? (Choose two.)
AResolving internal team conflicts.
BReporting productivity.
CSelecting the Product Owner.
DOrganizing the work required to meet the Sprint Goal.
✓ Verified Answer: AD
Question #65Part 2Select 2
Which two ways of creating Development Teams are consistent with Scrum's values? (Choose two.)
AExisting teams propose how they would like to go about organizing into the new structure.
BManagers personally re-assign current subordinates to new teams.
CManagers collaborate to assign individuals to specific teams.
DBring all the developers together and let them self-organize into Development Teams.
EThe Chief Product Owner determines the new team structures and assignments.
✓ Verified Answer: AD
Question #66Part 2
A Scrum Master is essentially the same thing as a traditional PM (Project Manager).
ATrue
BFalse
✓ Verified Answer: B
Question #67Part 2
A Product Owner wants advice from the Scrum Master about estimating work in Scrum. What guidance should a Scrum Master give? (Choose the best answer.)
AProduct Backlog items must be estimated in story points.
BEstimates are made by the people doing the work.
CEstimates must be in relative units.
DScrum forbids estimating.
EEstimates are made by the Product Owner, but are best checked with the Developers.
✓ Verified Answer: B
Question #68Part 2
What is the timebox for the Sprint Planning event?
A4 Hours for a monthly Sprint.
B8 Hours for a monthly Sprint.
CMonthly.
DWhenever it is done.
✓ Verified Answer: B
Question #69Part 2
Which Scrum Value is affected by a lack of trust in the Scrum Team?
AFocus
BRespect
COpenness
DCourage
ECommitment
✓ Verified Answer: F
Question #70Part 2Select 3
A Scrum Master is keeping a list of open impediments, but it is growing and he/she has been able to resolve only a small portion of the impediments. Which three techniques would be most helpful in this situation? (Choose three.)
AConsulting with the Development Team.
BPrioritizing the list and working on them in order.
CArranging a triage meeting with all project managers.
DAlerting management to the impediments and their impact.
✓ Verified Answer: ABD
Question #71Part 2
A product Increment must be released to production at the end of each Sprint.
ATrue
BFalse
✓ Verified Answer: B
Question #72Part 2
If burndown charts are used to visualize progress, what do they track?
AAccumulated cost.
BIndividual worker productivity.
CWork remaining across time.
DAccumulated business value delivered to the customer.
✓ Verified Answer: C
Question #73Part 2
How is management external to the Scrum Team involved in the Daily Scrum?
AThe Scrum Master speaks on their behalf.
BManagers are not required at the Daily Scrum.
CManagement gives an update at the start of each Daily Scrum.
DThe Product Owner represents their opinions.
✓ Verified Answer: A
Question #74Part 2
True or False: To get started in terms of what to build, Scrum requires no more than a Product Owner with enough ideas for a first Sprint, a Development Team to implement those ideas and a Scrum Master to help guide the process.
ATrue
BFalse
✓ Verified Answer: A
Question #75Part 2
What is the timebox for the Sprint Review?
AAs long as needed.
B2 hours for a one-month Sprint.
C4 hours for a one-month Sprint.
D1 day
✓ Verified Answer: C
Question #76Part 2
Who is responsible for tracking the remaining work of the Sprint?
AThe Development Team.
BThe Scrum Master.
CThe Project Manager.
DThe Development Team is consultation with the Product Owner.
EThe Product Owner.
✓ Verified Answer: A
Question #77Part 2
What is the tactic a Scrum Master should use to divide a group of 100 people into multiple Development Teams?
ACreate teams based on their skills across multiple layers (such as database, UI, etc.)
BAsk the Product Owner to assign the people to teams.
CAsk the developers to divide themselves into teams.
✓ Verified Answer: C
Question #78Part 2
Which statement best describes a Product Owner's responsibility? (Choose the best answer.)
AOptimizing the value of the work the Scrum Team does.
BEnsuring that the work meets the commitments to the stakeholders.
CDirecting the Development Team.
DKeep stakeholders from distracting the Development Team.
✓ Verified Answer: A
Question #79Part 2
The Sprint Review is mainly an inspect and adapt opportunity for which group?
AThe Development Team and stakeholders.
BThe Product Owner and Development Team.
CThe Scrum Team and stakeholders.
DThe Product Owner and management.
EThe Development Team and management.
✓ Verified Answer: C
Question #80Part 2
Which of the following best describes an increment of working software?
AA decomposition of all Product Backlog items into tasks for future Sprint Backlog lists.
BAdditional features in a usable state that complement those delivered in previous iterations.
CA new user interface design for functionality delivered in previous iterations.
DAn automated test suite to verify functionality delivered in previous iterations.
EUML diagrams that describe how to deliver functionality in future iterations.
✓ Verified Answer: B
Question #81Part 2Select 2
In order to achieve the benefits of Scrum, it is important to enact the value of commitment. What two actions demonstrate the commitment of Scrum Team members? (Choose two.)
AAlways deliver the items in the Sprint forecast.
BHelp the other Scrum Team members.
CDo your best.
DSend out a daily status report.
EWork late.
✓ Verified Answer: BC
Question #82Part 2
The Product Owner determines how many Product Backlog items the Development Team selects for a Sprint.
AFalse.
BTrue, accordingly to what was committed to the stakeholders.
CTrue, but only after confirmation by the resource manager that the Team has enough
DTrue.
EFalse, the Scrum Master does that.
✓ Verified Answer: A
Question #83Part 2Select 3
Which three of the following are feedback loops in Scrum? (Choose three.)
ASprint Review.
BRelease Planning.
CSprint Retrospective.
DRefinement Meeting.
EDaily Scrum.
✓ Verified Answer: ACE
Question #84Part 2
When a Development Team is having trouble delivering a working Increment because they don't understand a functional requirement, what should they do?
AAdd a specialist to the Development Team.
BPartially complete the functionality, and discuss the remaining work at the Sprint Review.
CCollaborate with the Product Owner to determine what is possible and acceptable.
DDefer the work to a more appropriate Sprint.
✓ Verified Answer: C
Question #85Part 2
When is the Sprint Backlog created?
AAt the beginning of the project.
BDuring the Sprint Planning meeting.
CPrior to the Sprint Planning meeting.
DDuring the Sprint.
✓ Verified Answer: B
Question #86Part 2
Which of the following services are appropriate for a Scrum Master in regard to the Daily Scrum?
ALead the discussions of the Development Team.
BMake sure that all 3 questions have been answered by each member of the team.
CKeep track of whether each team member has a chance to speak.
DTeach the Development Team to keep the Daily Scrum within the 15-minute time-box.
EAll of the above.
✓ Verified Answer: D
Question #87Part 2
Which of the following might the Scrum Team discuss during a Sprint Retrospective?
AMethods of communication.
BThe way the Scrum Team does Sprint Planning.
CSkills needed to improve the Development Team's ability to deliver.
DIts Definition of ג €Done ג €.
EAll of the above.
✓ Verified Answer: E
Question #88Part 2Select 2
What are the two primary ways a Scrum Master keeps a Development Team working at its highest level of productivity? (Choose two.)
ABy ensuring the meetings start and end at the proper time.
BBy keeping high value features high in the Product Backlog.
CBy facilitating Scrum Team decisions.
DBy removing impediments that hinder the Scrum Team.
✓ Verified Answer: CD
More SCRUM Certification Practice Exams
Explore related SCRUM exam dumps and free practice question banks.
📢 Unlock Full Access to Success!
"The content displayed here is a promotional preview and contains only 50% of the actual exam database. To access the complete set of updated questions, please upgrade to the Full Version."
👉 Click the button and follow the instructions to secure your full access immediately!