MB-335: Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Part 3
Question #: 41
Topic #: 1
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
An employee discovers an error after a time and attendance record is approved and transferred. The payroll transfer has not been run. However, the time has been posted against the production order.
You need to reverse the transferred registrations.
What happens to the production order time posting?
A. The Production Report as Finished journal is posted.
B. Negative values are offset through manual posting.
C. The production order is ended.
D. Transactions are offset and neutralized.
Selected Answer: D
———————————————————————-
Question #: 42
Topic #: 1
DRAG DROP
–
You are the product design manager for a computer manufacturer.
Your new laptop model is configurable. There are restrictions on which hardware components can be selected depending on the model. You create configuration groups for hardware and software.
You need to create a new laptop item number and configurations.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
No answers
Selected Answer: C
———————————————————————-
Question #: 43
Topic #: 1
HOTSPOT
–
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features, including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:
You need to create an expression-based constraint that will only allow Corner Protection if Metal is selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
No answers
Selected Answer: C
———————————————————————-
Question #: 44
Topic #: 1
HOTSPOT
–
A construction company specializes in building residential and commercial structures. The company uses discrete manufacturing in Dynamics 365 Supply Chain Management.
The company has the following business requirements:
• Construction tasks must be scheduled based on the project delivery date.
• All raw components must be available when the job begins.
You need to configure job scheduling for each production order.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: A
———————————————————————-
Question #: 45
Topic #: 1
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item.
This item has the following Lean setup:
• The setup uses a Lean schedule group with a throughput ratio = 2.
• The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1.
• The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day).
• The throughput is 10 per hour.
You need to set up a Discrete operation to mirror the item’s production flow activity.
What should you do?
A. Create a route with a runtime = 6, a process quantity = 1, and the operation’s hours/time = 1.
B. Create a route with a runtime = 1, a process quantity = 6, and the operation’s hours/time = 1.
C. Create a route with a runtime = 10, a process quantity = 6, and the operation’s hours/time = 1.
D. Create a route with a runtime = 1, a process quantity = 1, and the operation’s hours/time = 1.
Selected Answer: B
———————————————————————-
Question #: 46
Topic #: 1
HOTSPOT
–
A bicycle manufacturer uses Dynamics 365 Supply Chain Management.
The manufacturer experiences a supply chain issue with a metal used to fabricate the wheel. Due to the issue, the manufacturer must change the bicycle wheel assembly temporarily. Production workers require an interactive visual guide to complete production.
You need to configure the features.
Which features should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: B
———————————————————————-
Question #: 47
Topic #: 1
A company uses Lean manufacturing processes with Kanban boards.
When unexpected transfer jobs occur, the boards do not clear properly.
You need to ensure that the boards clear properly.
What are two possible ways to clear the board? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
A. Remove the planned Kanban job.
B. Change unplanned to planned.
C. Delete the unplanned job.
D. Revert the planned Kanban job status.
Selected Answer: B
———————————————————————-
Question #: 48
Topic #: 1
A company has three jobs in a job queue. JobB and JobC start while JobA is in progress. The following table shows the estimated production time for each job.
The actual work hours and total bundle time are shown in the following table.
You need to calculate the allocated time for JobA by using a Job allocation key.
What is the total allocated time for JobA?
A. 1 hour
B. 2 hours
C. 4 hours
D. 6 hours
E. 8 hours
Selected Answer: B
———————————————————————-
Question #: 49
Topic #: 1
HOTSPOT
–
A client uses Dynamics 365 Supply Chain Management. The client is implementing production control
You need to verify production quantities and costs at the end of each month.
Which production order status values should you search for? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: D
———————————————————————-
Question #: 50
Topic #: 1
HOTSPOT
–
A company makes lubricants and greases that are used in the automotive industry.
The items use the standard cost method. Electricity and heating of the manufacturing building are allocated into the cost of goods based on the size and wattage of the machine used.
You need to ensure that the system is set up to support the cost allocation.
How should you complete the costing sheet configuration? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: A
———————————————————————-
Question #: 51
Topic #: 1
DRAG DROP
–
You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.
A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.
You need to configure the Manufacturing execution production order defaults form to allow for backflushing on operations.
How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: B
———————————————————————-
Question #: 52
Topic #: 1
DRAG DROP
–
A process manufacturing company is implementing Dynamics 365 Supply Chain Management. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point
No answers
Selected Answer: B
———————————————————————-
Question #: 53
Topic #: 1
You produce 100 total units of finished goods. The amount of material used to produce the goods is the equivalent amount of material needed to produce 105 finished goods.
The company must track variances in material compared to the original estimated amount. You must only use one picking list journal for each production order.
You need to post a picking list that accounts for the material required to produce 105 finished goods.
What should you do?
A. When creating the lines for a picking list, select the estimated consumption option and override the consumption field with the actual amount to be consumed.
B. Increase the production order to a total quantity of 105 and re-estimate.
C. Report as finished five additional units into the good quantity and post a picking list for only the originally estimated amount.
D. In the Bill of materials production details, edit the estimated amount for each line to equal 105 units of raw material.
Selected Answer: A
———————————————————————-
Question #: 54
Topic #: 1
DRAG DROP
–
A company uses Discrete manufacturing concepts to produce cables. The company’s production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identity production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
No answers
Selected Answer: C
———————————————————————-
Question #: 55
Topic #: 1
DRAG DROP
–
A company uses manufacturing execution for processing of production orders.
Multiple production orders from last week need to be ended.
You need to process time registrations for all employees to allow the orders to end.
Which four steps should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
No answers
Selected Answer: B
———————————————————————-
Question #: 56
Topic #: 1
A company uses engineering change management for process manufacturing operations.
The company discovers that several products were configured with missing master data during the life cycle of the products.
You need to configure master data checks for the products.
Which three objects can you configure for data checks? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
A. standard, non-engineering products
B. product formulas
C. product BOM lines
D. engineering products
E. product versions
Selected Answer: BDE
———————————————————————-
Question #: 57
Topic #: 1
A company produces various products using Process manufacturing.
The manufacturer makes two co-products from a formula and rarely produces the primary formula item. The costs of making the co-products are inflated. The manufacturer must update the costs of producing the co-products and change the formula to not produce the primary formula item.
You need to change the primary formula item type.
What should you do?
A. Change the primary formula item to use the planning item type.
B. Change the production type to Bill of materials and recalculate the item cost.
C. Associate the costs to produce by-products with the items.
D. Change the cost of the primary formula item to zero and then recalculate the item cost.
Selected Answer: A
———————————————————————-
Question #: 58
Topic #: 1
A vendor plans to supply replacements for a product that they manufactured.
The cost associated with manufacturing most components of the replacement product differ from costs associated with the original product.
You need to plan for the new cost of the item in determining the sales price.
Which costing version explosion mode should you use?
A. According to BOM line type
B. Single level
C. Multilevel
D. Make to Order
Selected Answer: C
———————————————————————-
Question #: 59
Topic #: 1
DRAG DROP
–
A company uses the production control module in Dynamics 365 Supply Chain Management.
Production workers require precise instructions to know which tools and parts to use and how to use them when the workers put things together during the assembly process.
You need to configure the system to initiate mixed reality Dynamics 365 Guides for production workers.
Which four actions should you recommend be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
No answers
Selected Answer: C
———————————————————————-
Question #: 60
Topic #: 1
HOTSPOT
–
A company produces light projection toys for holiday decorations. For each toy, the company produces a template. The company plans to implement Lean manufacturing processes.
Production master data must meet the following requirements:
• Templates for a holiday must only be included for in-store products where that holiday is celebrated.
• Templates for a holiday must only be included for in-store products based upon that season.
• Online customers must be able to order specific toys for any holiday or region.
You need to implement production master data.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: C