MB-335: Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Part 1
Question #: 1
Topic #: 1
DRAG DROP
–
You are the product manager at an orange juice manufacturing company.
For every 1,000 pounds of orange juice, 20 pounds of orange pulp is created which can be sold or reused profitably. The cost is calculated as a weighted average between the quantity of orange juice that is reported as finished and the orange pulp based on the standard cost of each item.
You need to create the formula for orange juice that will produce orange pulp as a result of finishing a batch order.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
No answers
Selected Answer: D
———————————————————————-
Question #: 2
Topic #: 1
A company uses Dynamics 365 Supply Chain Management. Equipment installations in multiple regional locations require monthly maintenance.
Two maintenance technicians have holiday time off scheduled this month.
You need to ensure that all scheduled work orders are completed within the month around the holiday schedules.
Which feature should you use?
A. Activity-based subcontracting
B. Job scheduling
C. Capacity load calculation
D. Operations scheduling
E. Planning optimization
Selected Answer: B
———————————————————————-
Question #: 3
Topic #: 1
A company uses the asset management module in Dynamics 365 Supply Chain Management. The company has four conveyer systems in the warehouse. A robotic crane moves pallets of products to the conveyer line. Each robotic crane and conveyer line is considered a multilevel asset.
A work order arrives for a conveyer system. A technician completing the work order observes that the robotic crane needs a repair. The technician is not qualified to work on the robotic crane.
You need to ensure that the robotic crane is repaired.
Which two options should you configure? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
A. Create a manual work order.
B. Update the work order lifecycle state.
C. Calculate capacity load with the level field set to 0.
D. Calculate capacity load with the level field set to 1.
E. Create a related work order.
Selected Answer: AE
———————————————————————-
Question #: 4
Topic #: 1
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing company produces electronic components and devices.
The company has scheduling issues related to using working time calendars in manufacturing.
You need to ensure that the working time calendar is used when manufacturing jobs are scheduled.
Solution: Enable route groups for a process job type.
Does the solution meet the goal?
A. Yes
B. No
Selected Answer: A
———————————————————————-
Question #: 5
Topic #: 1
You are using the manufacturing execution module in Dynamics 365 Supply Chain Management.
License plate labels must be printed for products in the Report as finished step.
You need to use the manufacturing execution functionality that meets this requirement.
What should you use?
A. Operations schedules
B. Job card terminal
C. Load planning workbench
D. Report BOMs as finished
Selected Answer: B
———————————————————————-
Question #: 6
Topic #: 1
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
A. Change the coverage group on the kit item to Manual.
B. Select Phantom on the engineering fast tab on the kit item.
C. Change the line type to Pegged supply.
D. Change the line type to Phantom.
Selected Answer: D
———————————————————————-
Question #: 7
Topic #: 1
A company produces rubber hose. Discrete orders accounts for raw material scrap. The scrap is reported through inventory movement journals.
The company has noticed that most of the scrap that is recorded is due to start up that feeds the hose to the finishing process. In addition, the amount of scrap that is recorded is consistent regardless of the amount of hose being produced.
You need to account for material lost during startup.
What should you do?
A. Enter the consumption amount on the line to match the actual amount used.
B. Do a case study for the scrap items and enter the average amount of scrap as separate line items on the Bill of materials.
C. Enter the amount of scrap that is consumed as constant scrap in the Bill of materials.
D. Enter the amount of scrap that is consumed as variable scrap in the Bill of materials.
Selected Answer: C
———————————————————————-
Question #: 8
Topic #: 1
A manufacturer uses Dynamics 365 Supply Chain Management.
The engineering department constantly revises product designs to stay current with the latest technology. The customer service department places orders for the products but frequently adds a prototype product version that is not yet operational.
The manufacturer requires a solution that notifies customer service if a prototype version is selected on a sales order.
You need to configure the solution.
What should you configure?
A. product release policy
B. product lifecycle states
C. version number rule
D. engineering product category
Selected Answer: B
———————————————————————-
Question #: 9
Topic #: 1
DRAG DROP
–
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and include constraints in the model.
You need to determine which constraint type to use for each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: C
———————————————————————-
Question #: 10
Topic #: 1
You are the production supervisor at a chemical processing plant.
You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.
You need to ensure that the values of attributes are updated and tracked.
What three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A. Create attribute types.
B. Create a test instrument for each attribute.
C. Set up batch attributes.
D. Assign the attributes to the appropriate test on the test group.
E. Assign the attributes to the chemicals.
Selected Answer: CDE
———————————————————————-
Question #: 11
Topic #: 1
DRAG DROP
–
A recreational vehicle (RV) manufacturing company is implementing Dynamics 365 Supply Chain Management. All RVs are configured to order.
Quality checks show that there is an issue with the sealant used with the windows in some of the RVs.
You need to identify which RV models use the sealant and change the sealant item.
Which function should you use for each requirement? To answer, drag the appropriate functions to the correct requirements. Each function may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: A
———————————————————————-
Question #: 12
Topic #: 1
DRAG DROP
–
You are a manufacturer using Dynamics 365 Supply Chain Management.
A new series of orders is authorized for production.
You need to identify which documents to use for the released production order.
Which document should you use for each requirement? To answer, drag the appropriate documents to the correct requirements. Each document may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: D
———————————————————————-
Question #: 13
Topic #: 1
A manufacturing plant uses Lean manufacturing. Operators process Kanban consumption manually by using a mobile device.
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?
A. Select to register as empty when handling units are received.
B. Select to manually register as empty.
C. Set a fixed Kanban quantity.
D. Select to register as empty when the source requirement is registered.
Selected Answer: A
———————————————————————-
Question #: 14
Topic #: 1
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products.
The finance and production teams want a way to view individual raw material consumption costs in the ledger.
You need to add a production group to the finished good to control postings to the ledger.
What should you do?
A. Update the cost of the generic finished good item.
B. Create a production group for the finished good item.
C. Create a production pool for the finished good item.
D. Create a new Bill of materials with alternate costs for the raw material.
Selected Answer: B
———————————————————————-
Question #: 15
Topic #: 1
HOTSPOT
–
A company plans to implement routing and route postings.
You must direct postings of route cards based upon the route groups at Report as finished. You set the start default order setting for route posting to Never and the Report as finished setting to Route Group Dependent.
You set up the route group as shown below.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: B
———————————————————————-
Question #: 16
Topic #: 1
HOTSPOT
–
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: C
———————————————————————-
Question #: 17
Topic #: 1
HOTSPOT
–
A company produces homeopathic lotions for pain relief and uses Dynamics 365 Supply Chain Management.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
No answers
Selected Answer: C
———————————————————————-
Question #: 18
Topic #: 1
A company configures master planning to order large and expensive aluminum sheets that are only available at certain times of the year.
The warehouse manager reports that replenishment levels are too high, causing inventory value to be over budget. In addition, the aluminum sheets take up too much space on the shop floor.
You need to configure the appropriate replenishment method.
Which coverage dimension should you use?
A. Per period
B. Manual
C. Min/Max
D. Per requirement
Selected Answer: B
———————————————————————-
Question #: 19
Topic #: 1
A manufacturing company is implementing production in Dynamics 365 Supply Chain Management.
The production scheduler requires that machines not be scheduled to run concurrently when planning production. The scheduler also must be able to see the scheduling in a graphical view.
You need to configure the system to meet the requirements.
Which three options should you configure? Each answer presents a partial solution.
NOTE: Each correct selection is worth one point.
A. bottleneck resource
B. finite capacity
C. operations scheduling
D. job scheduling
E. Capable to Promise
Selected Answer: ABD
———————————————————————-
Question #: 20
Topic #: 1
A manufacturing company uses master planning in Dynamics 365 Supply Chain Management.
The production planner increases the lead time of an item. On the next master planning output, the planner receives a cancel action message on existing purchase orders. The message includes a suggested earlier date for the planned purchase orders.
The demand for the item has not changed since the original purchase order was placed. Dynamic negative days is not used.
You need to resolve the issue.
What should you do?
A. Increase positive days.
B. Decrease positive days.
C. Decrease negative days to be less than the item lead time.
D. Increase negative days to be greater than the item lead time.
Selected Answer: A